TESORERIA MUNICIPAL DE MONTERREY
DIRECCION DE EGRESOS
PAGOS DE BIENES Y SERVICIOS DEL MES DE MZO-07
PROV NOMBRE FACT DESCRIPCION ORDEN PAGO FECH-PAG BCO CH
110036 SEMEX,S.A. 1718 SEMAF.GSA/2AB-X1-OPRP25/04C M99-1489 423,912.07 3/27/07 200 2
110036 SEMEX,S.A. 1719 SEMAFO.SAD/2-ABR-A2-OPRP-25/04-C M99-1488 106,927.17 3/27/07 200 2
110036 SEMEX,S.A. 1794 SEMAFO.SAD/SENDER-X2-OPRP-26/04-C M99-1503 329,923.98 3/27/07 200 2
110036 SEMEX,S.A. 1797 SEMAFO.SAD/SENDER-A3-OPRP-26/04-C M99-1502 143,147.59 3/27/07 200 2
110036 SEMEX,S.A. 1798 SEMAF.GSA/SEND-X1-OPRP26/04C M99-1504 700,472.85 3/27/07 200 2
110036 SEMEX,S.A. 1799 SEMAFO.SAD/EDO-X1-OP-RP-23/04-C M99-1501 352,140.83 3/27/07 200 2
110036 SEMEX,S.A. 4790 SUMINISTRO CONTROLADORES DE SEMAFORSO SA M33-0835 3,107,214.00 3/27/07 200 2
Total 110036 5,163,738.49
110764 VILLARREAL PARTIDA RODOLFO 3389 500 TN DE CARPETA ASFALTICA OC1-8755 32,499.00 3/27/07 200 3
110764 VILLARREAL PARTIDA RODOLFO 3390 500 TN BASE 8 OC1-8756 32,499.00 3/27/07 200 3
110764 VILLARREAL PARTIDA RODOLFO 3398 500 TN BASE 8 OC1-8757 32,499.00 3/27/07 200 3
110764 VILLARREAL PARTIDA RODOLFO 3401 500 TN BASE 8 OC1-8753 32,499.00 3/27/07 200 3
110764 VILLARREAL PARTIDA RODOLFO 3600 500 TN DE BASE 8 OC2-0595 32,499.00 3/27/07 200 3
110764 VILLARREAL PARTIDA RODOLFO 3696 400 TN DE BASE 8 OC2-0594 25,999.20 3/27/07 200 3
110764 VILLARREAL PARTIDA RODOLFO 3697 500 TN DE BASE 8 OC2-0596 32,499.00 3/27/07 200 3
110764 VILLARREAL PARTIDA RODOLFO 3716 440 TN DE BASE 8 OC2-0625 28,599.12 3/27/07 200 3
110764 VILLARREAL PARTIDA RODOLFO 3768 SUM.TIERRA NEGRA ORN.Y FOREST. SADA-05/2 M33-0849 2,296,320.00 3/27/07 200 3
110764 VILLARREAL PARTIDA RODOLFO 4211 500 TN BASE 8 OC2-1623 32,499.00 3/27/07 71 315
Total 110764 2,578,411.32
113621 GONZALEZ SESMA RICARDO 5711 CLIN.SER.MED-E3-SSPDACI06/06 A20-1528 337,422.77 3/30/07 71 426
Total 113621 337,422.77
114598 CONSORCIO CONSTRUCTIVO Y PROYE 151 PROY.PTE.LEONES/R.FRI.-A-OPRP02/07IR M99-2241 414,024.10 3/28/07 71 346
Total 114598 414,024.10
114665 OCEGUEDA RIOS FRANCISCO 652 REMOFSEDUE-E1-OPRP01/07IR M99-2271 422,080.94 3/28/07 71 342
Total 114665 422,080.94
119182 PAVIMENTACIONES CAMINOS Y COMP 9004 2000 PZ CARPETA ASFALTICA OC1-8825 918,735.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9063 2000 PZ CARPETA ASFALTICA OC1-9746 918,735.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9070 2000 PZ CARPETA ASFALTICA OC1-9748 918,735.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9093 2000 PZ CARPETA ASFALTICA OC1-9747 918,735.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9188 2000 PZ CARPETA ASFALTICA CON FLETE OC2-0192 918,735.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9189 2000 PZ CARPETA ASFALTICA OC2-0193 918,735.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9209 2000 PZ CARPETA ASFALTICA OC2-0194 918,735.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9242 4000 TON CARPETA ASFALTICA CALIENTE OC2-0561 2,106,662.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9243 2000 TON CARPETA ASFALTICA CALIENTE OC2-0562 1,053,331.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9245 2792 CARPETA ASFALTICA OC2-0563 1,282,554.06 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9286 7500 LT E ASFALTO FR3 OC2-0195 30,877.50 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9313 500 TN CARPETA ASFALTICA CALIENTE OC2-0207 201,250.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9314 500 TN CARPETA ASFALTICA CALIENTE OC2-0206 201,250.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9403 1000 TON. CARPETA ASFALTICA OC2-1141 526,665.50 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9405 2000 TON. CARPETA ASFALTICA OC2-1144 1,053,331.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9406 2000 TON. CARPETA ASFALTICA OC2-1142 1,053,331.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9407 2000 TON. CARPETA ASFALTICA OC2-1143 1,053,331.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9446 500 TN CARPETA ASFALTICA OC2-0209 201,250.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9447 500 TN DE CFARPETA ASFALTICA OC1-8922 201,250.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9448 500 TN CARPETA ASFALTICA OC2-0203 201,250.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9449 500 TN DE BASE 8 OC2-0213 201,250.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9450 500 TN DE CARPETA ASFALTICA OC1-8921 201,250.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9451 500 TN CARPETA ASFALTICA OC2-0212 201,250.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9452 7500 LT DE ASFALTO OC2-1058 30,877.50 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9453 7500 LT DE ASFALTO OC2-1051 30,877.50 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9454 7500 ASFALTO FR3 OC2-0201 30,877.50 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9455 7500 LT DE ASFALTO OC2-1045 30,877.50 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9456 7500 LT DE ASFALTO OC2-1056 30,877.50 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9470 10000 EMULSION ASFALTICA OC2-1013 32,200.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9566 300 TN DE CARPETA ASFALTICA OC2-1614 138,441.60 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9567 500 TON. CARPETA ASFALTICA OC2-1615 230,736.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9568 500 TON. CARPETA ASFALTICA OC2-1626 230,736.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9569 500 TON. CARPETA ASFALTICA OC2-1616 230,736.00 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9573 13568 LT DE EMULSION ASFALTICA OC2-1017 43,688.96 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9576 300 TON. CARPETA ASFALTICA OC2-1625 138,441.60 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9577 300 TON. CARPETA ASFALTICA OC2-1617 138,441.60 3/27/07 200 10
119182 PAVIMENTACIONES CAMINOS Y COMP 9578 500 TN DE CARPETA ASFALTICA OC2-1613 230,736.00 3/27/07 200 10
Total 119182 17,769,773.32
120327 FACULTAD DE INGENIERIA CIVIL U 1361 EST. GEOTECNICO PUENTE RANGEL FRIAS M99-2184 36,560.00 3/21/07 71 143
Total 120327 36,560.00
122536 RANGEL MORAN ANTOLIN 2346 PZA.C-R.PRIM-A1-SSPDACI03/06 A20-1512 149,863.95 3/30/07 71 422
122536 RANGEL MORAN ANTOLIN 2347 PZA.C-R.PRIM-E2-SSPDACI03/06 A20-1513 69,208.56 3/30/07 71 422
Total 122536 219,072.51
123018 VITESA CONSTRUCTORA,S.A. DE C. 922 BACH.C-M.LUISA-E3-SSPDACI04/05 A20-1503 98,481.01 3/30/07 71 423
123018 VITESA CONSTRUCTORA,S.A. DE C. 923 BACH.C-M.LUISA-X1-SSPDACI04/05 A20-1504 202,528.12 3/30/07 71 423
123018 VITESA CONSTRUCTORA,S.A. DE C. 928 BACH.C-M.LUISA-A1-SSPDACI04/05 A20-1505 47,191.14 3/30/07 71 423
Total 123018 348,200.27
123060 CONST. MAIZ MIER,S.A. DE C.V. 16683 PAV.C-B.MPALES-X7-OPFM-05/02-C M99-1550 171,840.13 3/9/07 10 1914
123060 CONST. MAIZ MIER,S.A. DE C.V. 16684 PAV.C-B.MPALES-A4-OPFM-05/02-C M99-1547 51,545.14 3/9/07 10 1914
Total 123060 223,385.27
123082 CONSTRUCTORA COEXSA, S.A. DE C 3565 PAV.C-B.EDO.E1-OPR33PM07/06IR M99-2226 456,751.88 3/12/07 69 206
Total 123082 456,751.88
123140 GUERRERO SEGURA NESTOR 2584 1 JAR. 2 PRIM.-A-OPRE02/07IR M99-2252 119,582.43 3/28/07 71 347
Total 123140 119,582.43
123168 CONST.Y SERVICIOS DEL NORESTE, 2085 PAV.C-INDUST-E1-OPR33PM06/06IR M99-2222 76,584.82 3/2/07 65 184
123168 CONST.Y SERVICIOS DEL NORESTE, 2108 PAV.C-INDUST-E2-OPR33PM06/06IR M99-2248 331,813.40 3/26/07 69 208
Total 123168 408,398.22
123269 INFRAESTRUCTURA INTEGRAL 2000, 1385 2 PRIM.-A-OPRE01/07IR M99-2240 142,106.80 3/28/07 71 348
Total 123269 142,106.80
123343 RAMIREZ GUEVARA FRANCISCO MART 575 TECHUMB.U.DEPO-E1-OPDIFPM01/06IR M99-2233 140,823.97 3/23/07 71 203
Total 123343 140,823.97
123426 GONVEL, SA. 1042 3 PRIM.-A-OPRE03/07IR M99-2235 120,767.99 3/28/07 71 349
Total 123426 120,767.99
123436 CONSTRUCC.Y URBAN.DEL PTE, SA. 1176 PAV.C-MIRASOL-E3-OPRP21/06IR M99-2244 580,400.13 3/27/07 71 334
Total 123436 580,400.13
123447 JAIMES QUINTANILLA RICARDO 1140 PAV.C-MIRASOL-E2-OPRP11/06IR M99-2218 552,611.46 3/27/07 71 335
123447 JAIMES QUINTANILLA RICARDO 1141 PAV.C-MIRASOL-A2-OPRP11/06IR M99-2221 14,912.81 3/27/07 71 335
123447 JAIMES QUINTANILLA RICARDO 1142 PAV.C-MIRASOL-E3-OPRP11/06IR M99-2236 254,202.99 3/27/07 71 335
Total 123447 821,727.26
123458 CONSTRUCCIONES PERMELL, SA. 2076 PAV.C-MIRASOL-E3-OPRP20/06IR M99-2216 497,007.65 3/27/07 71 336
123458 CONSTRUCCIONES PERMELL, SA. 2091 PAV.C-MIRASOL-A3-OPRP20/06IR M99-2247 6,271.75 3/27/07 71 336
123458 CONSTRUCCIONES PERMELL, SA. 2092 PAV.C-MIRASOL-E5-OPRP20/06IR M99-2246 182,943.64 3/27/07 71 336
123458 CONSTRUCCIONES PERMELL, SA. 2093 PAV.C-MIRASOL-A2-OPRP20/06IR M99-2234 19,099.07 3/27/07 71 336
123458 CONSTRUCCIONES PERMELL, SA. 2094 PAV.C-MIRASOL-E4-OPRP20/06IR M99-2245 3,135.88 3/27/07 71 336
123458 CONSTRUCCIONES PERMELL, SA. 2098 PAV.C-MIRASOL-E3-OPRP14/06IR M99-2249 348,936.89 3/27/07 71 336
Total 123458 1,057,394.88
123475 PROYECTOS URBANISTICOS GRECIA, 396 PAV.C-MIRASOL-E1-OPRP12/06IR M99-2219 194,713.90 3/27/07 71 288
123475 PROYECTOS URBANISTICOS GRECIA, 398 PAV.C-MIRASOL-A1-OPRP12/06IR M99-2220 23,062.87 3/27/07 71 288
123475 PROYECTOS URBANISTICOS GRECIA, 401 PAV.C-MIRASOL-E2-OPRP08/06C M99-2225 1,185,675.42 3/27/07 71 288
123475 PROYECTOS URBANISTICOS GRECIA, 416 PAV.C-MIRASOL-E3-OPRP08/06C M99-2229 466,153.58 3/27/07 71 288
123475 PROYECTOS URBANISTICOS GRECIA, 417 PAV.C-MIRASOL-A3-OPRP08/06C M99-2230 14,054.85 3/27/07 71 288
123475 PROYECTOS URBANISTICOS GRECIA, 420 PAV.C-MIRASOL-X1-OPRP12/06IR M99-2237 3,488.16 3/27/07 71 288
123475 PROYECTOS URBANISTICOS GRECIA, 422 PAV.C-MIRASOL-E2-OPRP12/06IR M99-2238 68,625.19 3/27/07 71 288
123475 PROYECTOS URBANISTICOS GRECIA, 426 PAV.C-MIRASOL-A2-OPRP12/06IR M99-2239 6,134.20 3/27/07 71 288
Total 123475 1,961,908.17
123480 PAVIMENTACIONES Y VOLADURAS ES 1058 PAV.C-INDEPE-E2-SSPDACI04/06 A20-1500 87,129.98 3/30/07 71 424
Total 123480 87,129.98
123483 CONSTRUCTORA ROBHE, SA. DE CV. 2979 PAV.C-MIRASOL-E3-OPRP09/06IR M99-2217 224,912.60 3/27/07 71 289
123483 CONSTRUCTORA ROBHE, SA. DE CV. 2984 PAV.C-MIRASOL-E4-OPRP09/06IR M99-2242 3,595.15 3/27/07 71 289
123483 CONSTRUCTORA ROBHE, SA. DE CV. 2985 PAV.C-MIRASOL-E5-OPRP09/06IR M99-2243 120,332.56 3/27/07 71 289
Total 123483 348,840.31
123485 RINCON GAMON MARIA 128 TALU.MAMPOS.M.PRI-A-OPRP03/07IR M99-2228 78,454.51 3/14/07 71 104
Total 123485 78,454.51
125897 MARTINEZ GRACIA ARTURO 202 SUPER.OBRAS ENE, FEB-07 M99-2259 51,345.00 3/29/07 71 379
125897 MARTINEZ GRACIA ARTURO 203 SUPER.OBRAS MZO-07 M99-2260 25,672.50 3/29/07 71 379
Total 125897 77,017.50
125898 VILLARREAL FLORES CARLOS ALBER 152 SUPER.OBRAS MZO-07 M99-2256 31,500.00 3/29/07 71 380
125898 VILLARREAL FLORES CARLOS ALBER 153 SUPER.OBRAS ENE, FEB-07 M99-2255 63,000.00 3/29/07 71 380
Total 125898 94,500.00
125899 GAONA SALAZAR PABLO 2 SUPER.OBRAS ENE,FEB-07 M99-2257 58,380.00 3/29/07 71 381
125899 GAONA SALAZAR PABLO 3 SUPER.OBRAS MZO-07 M99-2258 29,190.00 3/29/07 71 381
Total 125899 87,570.00
125900 RODRIGUEZ TORRES DAMASO 3 SUPER.OBRAS MZO-07 M99-2262 20,422.50 3/29/07 71 382
125900 RODRIGUEZ TORRES DAMASO 4 SUPER.OBRAS ENE, FEB.-07 M99-2261 40,845.00 3/29/07 71 382
Total 125900 61,267.50
125901 GARCIA GARCIA JUAN FRANCISCO 2 SUPER.OBRAS MZO-07 M99-2268 21,588.00 3/29/07 71 383
125901 GARCIA GARCIA JUAN FRANCISCO 3 SUPER.OBRAS ENE-FEB-07 M99-2267 43,176.00 3/29/07 71 383
Total 125901 64,764.00
125902 NAVARRO GONZALEZ RUBEN 2 SUPER.OBRAS MZO-07 M99-2266 8,400.00 3/29/07 71 384
125902 NAVARRO GONZALEZ RUBEN 3 SUPER.OBRAS ENE,FEB-07 M99-2265 16,800.00 3/29/07 71 384
Total 125902 25,200.00
125903 MARTINEZ FLORES EDUARDO 2 SUPER.OBRAS MZO-07 M99-2264 9,345.00 3/29/07 71 385
125903 MARTINEZ FLORES EDUARDO 3 SUPER.OBRAS ENE, FEB-07 M99-2263 18,690.00 3/29/07 71 385
Total 125903 28,035.00
125932 GOMEZ LEAL ARTURO JOSE 1 SUPER.OBRAS ENE-FEB-07 M99-2253 25,200.13 3/29/07 71 386
125932 GOMEZ LEAL ARTURO JOSE 2 SUPER.OBRAS MZO-07 M99-2254 14,000.07 3/29/07 71 386
Total 125932 39,200.20
Total general 34,314,509.72