TESORERIA MUNICIPAL DE MONTERREY |
|
|
|
|
|
DIRECCION
DE EGRESOS |
|
|
|
PAGOS
DICIEMBRE-2004 |
|
|
|
|
|
|
FACTURA |
DESCRIPCION |
FECHA PAGO |
IMPORTE |
ORDEN |
BCO |
CHEQUE |
|
PROVEEDOR |
110036 SEMEX,S.A. |
|
|
|
42550 |
SEMAFOR-G.SA/S.AGUA-E1-OP-RP-11/04-C |
17/12/2004 |
$1,159,101.52 |
M99-0771 |
24 |
477 |
|
42723 |
SENAL.DESVIA.G.SA/AGUA-A1-OP-RP-06/04-IR |
17/12/2004 |
$48,134.00 |
M99-0821 |
24 |
477 |
|
42724 |
SENAL.DESVIA.G.SA/AGUA-X1-OP-RP-06/04-IR |
17/12/2004 |
$142,943.27 |
M99-0822 |
24 |
477 |
|
|
|
|
|
TOTAL |
|
$1,350,178.79 |
|
|
|
|
PROVEEDOR |
110086 CONCRETOS ASFALTICOS,S.A.DE C.V. |
|
|
|
7840 |
PAV.CAM.MIRADOR-E2-OP-RP-14/04-C |
23/12/2004 |
$325,346.65 |
M99-0770 |
1 |
53521 |
|
|
|
|
|
TOTAL |
|
$325,346.65 |
|
|
|
|
PROVEEDOR |
110744 INTELLISWITCH,S.A.DE C.V. |
|
|
|
4261 |
ARRENDAMIENTO DE 311 EQ. AHORR. DE ENERG |
03/12/2004 |
$216,776.87 |
A20-0924 |
24 |
338 |
|
4303 |
ARRENDAMIENTO DE 160 EQ. AHORR. DE ENERG |
03/12/2004 |
$122,006.96 |
A20-0925 |
24 |
338 |
|
4332 |
REM. Y MODER. 47 EQ. PROPIEDAD DE MPIO |
03/12/2004 |
$257,278.00 |
A20-0934 |
24 |
338 |
|
4333 |
RELATIVO A REM. Y MOD. 47 EQ. PROP DEL M |
03/12/2004 |
$257,278.00 |
A20-0935 |
24 |
338 |
|
|
|
|
|
TOTAL |
|
$853,339.83 |
|
|
|
|
PROVEEDOR |
111035 EL PARIAN JARDINERIA INTEGRAL,S.A |
.DE C.V. |
|
|
1784 |
SERV.PROF.ASESORIA PAISAJE URBANO |
21/12/2004 |
$304,750.00 |
C15-0103 |
24 |
527 |
|
|
|
|
|
TOTAL |
|
$304,750.00 |
|
|
|
|
PROVEEDOR |
112760 ASFALTECS,S.A.DE C.V. |
|
|
|
5673 |
PAV.C-V.HERM-E2-SSP-DA-CI-26/04 |
03/12/2004 |
$108,605.72 |
A20-0945 |
24 |
340 |
|
5674 |
PAV.C-V.HERM-E3-SSP-DA-CI-26/04 |
03/12/2004 |
$96,730.95 |
A20-0946 |
24 |
340 |
|
5684 |
300 TN BASE 8 CON FLETE |
13/12/2004 |
$17,697.00 |
OC0-6642 |
24 |
420 |
|
5686 |
PAV.C-V.HERM-A1-SSP-DA-CI-26/04 |
03/12/2004 |
$23,689.59 |
A20-0947 |
24 |
340 |
|
5687 |
500 TNCARPETA ASFALTICA |
13/12/2004 |
$171,999.75 |
OC0-8138 |
24 |
420 |
|
5690 |
300 TN ASFALTO |
15/12/2004 |
$17,670.90 |
OC0-8116 |
24 |
423 |
|
5693 |
300 TN BASE 8 C FLETE |
13/12/2004 |
$17,670.90 |
OC0-9248 |
24 |
420 |
|
5694 |
BASE NO. 8 CON FLETE |
13/12/2004 |
$17,670.90 |
OC0-9249 |
24 |
420 |
|
5695 |
BASE NO. 8 CON FLETE |
13/12/2004 |
$17,670.90 |
OC0-9246 |
24 |
420 |
|
5711 |
3000 TN. ASFALTO |
15/12/2004 |
$12,000.00 |
OC0-7509 |
24 |
423 |
|
5712 |
3000 TN. ASFALTO FR-3 SIN FLETE |
15/12/2004 |
$12,000.00 |
OC0-9342 |
24 |
423 |
|
5713 |
3000 TN. ASFALTO FR-3 SIN FLETE |
15/12/2004 |
$12,000.00 |
OC0-9333 |
24 |
423 |
|
5721 |
CARPETA ASFALTICA |
15/12/2004 |
$171,999.75 |
OC0-8124 |
24 |
423 |
|
5722 |
500 TN. CARPETA ASFALTICA |
15/12/2004 |
$171,999.75 |
OC0-9560 |
24 |
423 |
|
5730 |
300 TN. BASE 8 CON FLETE |
22/12/2004 |
$17,670.90 |
OC0-8113 |
24 |
548 |
|
5731 |
300 TN BASE 8 |
22/12/2004 |
$17,670.90 |
OC0-8117 |
24 |
548 |
|
5735 |
500 TN. CARPETA ASFALTICA |
22/12/2004 |
$171,999.75 |
OC0-8139 |
24 |
548 |
|
5740 |
3000 LT. ASFALTO FR3 |
22/12/2004 |
$12,000.00 |
OC0-6789 |
24 |
548 |
|
|
|
|
|
TOTAL |
|
$1,088,747.66 |
|
|
|
|
PROVEEDOR |
113264 COMERCIALIZADORA INTERNACIONAL DE |
HORTICULT |
URA,S.A |
|
10533 |
REFOR.G.SAD-A-SSP-DA-CI-56/04 |
22/12/2004 |
$504,669.27 |
A20-1012 |
24 |
537 |
|
|
|
|
|
TOTAL |
|
$504,669.27 |
|
|
|
|
PROVEEDOR |
113278 COMPACTACIONES Y OBRAS DE MTY.S.A |
.DE C.V. |
|
|
2896 |
CISTERN.D-TODAS-A-SSP-DA-LP-14/04 |
10/12/2004 |
$1,155,812.24 |
A20-0962 |
24 |
389 |
|
|
|
|
|
TOTAL |
|
$1,155,812.24 |
|
|
|
|
PROVEEDOR |
113293 LOREDO SILVA ANA ISABEL |
|
|
|
1211 |
EXPL.ORNAT-A-SSP-DA-CI-55/04 |
10/12/2004 |
$240,242.67 |
A20-0931 |
24 |
390 |
|
|
|
|
|
TOTAL |
|
$240,242.67 |
|
|
|
|
PROVEEDOR |
113609 GRUPO CONSTRUCTOR ACERO,S.A.DE C. |
V. |
|
|
1110 |
PLZS.P.SOL-E3-SSP-DA-CI-16/04 |
24/12/2004 |
$162,391.39 |
A20-1039 |
1 |
53539 |
|
1111 |
PLZS.P.SOL-A2-SSP-DA-CI-16/04 |
24/12/2004 |
$89,136.86 |
A20-1038 |
1 |
53539 |
|
1112 |
PLZS.P.SOL-X1-SSP-DA-CI-16/04 |
24/12/2004 |
$93,695.69 |
A20-1037 |
1 |
53539 |
|
|
|
|
|
TOTAL |
|
$345,223.94 |
|
|
|
|
PROVEEDOR |
113626 PROYECTOS Y ELECTRIFICACIONES MV, |
S.A.DE C.V |
. |
|
119 |
FOCOS |
02/12/2004 |
$26,953.00 |
OC0-8408 |
24 |
318 |
|
127 |
BALASTRAS |
21/12/2004 |
$65,370.00 |
OC0-8458 |
24 |
523 |
|
128 |
BALASTRAS |
21/12/2004 |
$65,370.00 |
OC0-8476 |
24 |
523 |
|
134 |
CABLES |
02/12/2004 |
$170,780.00 |
OC0-8507 |
24 |
318 |
|
136 |
POLIDUCTO |
21/12/2004 |
$4,944.00 |
OC0-8441 |
24 |
523 |
|
137 |
POLIDUCTO |
21/12/2004 |
$4,944.00 |
OC0-8423 |
24 |
523 |
|
138 |
POLIDUCTO |
21/12/2004 |
$4,944.00 |
OC0-8442 |
24 |
523 |
|
139 |
POLIDUCTOS |
21/12/2004 |
$4,944.00 |
OC0-8520 |
24 |
523 |
|
141 |
BALASTRA |
21/12/2004 |
$28,762.80 |
OC0-8433 |
24 |
523 |
|
142 |
BALASTRAS |
21/12/2004 |
$28,762.80 |
OC0-8501 |
24 |
523 |
|
143 |
BALASTRA |
21/12/2004 |
$26,148.00 |
OC0-8435 |
24 |
523 |
|
144 |
BALASTRAS |
21/12/2004 |
$31,377.60 |
OC0-8524 |
24 |
523 |
|
145 |
CABLE |
21/12/2004 |
$65,250.00 |
OC0-8486 |
24 |
523 |
|
146 |
CABLE |
21/12/2004 |
$65,250.00 |
OC0-8488 |
24 |
523 |
|
147 |
CABLE |
21/12/2004 |
$65,250.00 |
OC0-8490 |
24 |
523 |
|
148 |
80 BALASTRAS |
21/12/2004 |
$41,836.80 |
OC0-8483 |
24 |
523 |
|
149 |
80 BALASTRAS |
21/12/2004 |
$41,836.80 |
OC0-8491 |
24 |
523 |
|
150 |
80 BALASTRAS |
21/12/2004 |
$41,836.80 |
OC0-8448 |
24 |
523 |
|
151 |
CONTACTOR T-3 |
23/12/2004 |
$10,301.34 |
OC0-8399 |
24 |
554 |
|
152 |
CONTACTOR |
23/12/2004 |
$10,301.34 |
OC0-8473 |
24 |
554 |
|
153 |
CONTACTOR |
23/12/2004 |
$34,337.80 |
OC0-8479 |
24 |
554 |
|
154 |
BALASTRAS, CONTACTOR Y POLIDUCTO |
23/12/2004 |
$47,436.90 |
OC0-8505 |
24 |
554 |
|
155 |
BALASTRAS, CONTACTOR Y POLIDUCTO |
23/12/2004 |
$47,436.90 |
OC0-8405 |
24 |
554 |
|
156 |
BALASTRAS, CONTACTOR Y POLIDUCTO |
23/12/2004 |
$47,436.90 |
OC0-8403 |
24 |
554 |
|
157 |
BALASTRAS, CONTACTOR Y POLIDUCTO |
23/12/2004 |
$47,436.90 |
OC0-8517 |
24 |
554 |
|
158 |
CABLES, FOCOS Y BALASTRAS |
21/12/2004 |
$57,482.80 |
OC0-9743 |
24 |
523 |
|
159 |
CABLES, FOCOS Y BALASTRAS |
21/12/2004 |
$72,867.00 |
OC0-9739 |
24 |
523 |
|
160 |
CABLES, FOCOS Y BALASTRAS |
21/12/2004 |
$72,867.00 |
OC0-9742 |
24 |
523 |
|
|
|
|
|
TOTAL |
|
$1,232,465.48 |
|
|
|
|
PROVEEDOR |
113649 CONSTRUCCIONES Y EXCAVACIONES DEL |
NTE.S.A.D |
E C.V. |
|
1691 |
PLZS.1-2-C-V.ALTO-A3-SSP-DA-CI-31/04 |
21/12/2004 |
$14,888.87 |
A20-0965 |
24 |
509 |
|
1692 |
PLZS.1-2-C-V.ALTO-E4-SSP-DA-CI-31/04 |
21/12/2004 |
$77,987.96 |
A20-0964 |
24 |
509 |
|
1694 |
PAV.C-CTO-A-SSP-DA-LP-16/04 |
06/12/2004 |
$513,338.05 |
A20-0952 |
24 |
363 |
|
1695 |
PLZS.1-2-C-V.ALTO-X1-SSP-DA-CI-31/04 |
21/12/2004 |
$22,040.11 |
A20-0966 |
24 |
509 |
|
1696 |
REH.PZS.C-ALIANZA-E1-SSP-DA-LP-12/04 |
22/12/2004 |
$146,483.37 |
A20-0987 |
24 |
538 |
|
1698 |
PLZS.C-V.ALTO-E5-SSP-DA-CI-31/04 |
24/12/2004 |
$8,768.06 |
A20-1021 |
24 |
561 |
|
1699 |
PLZS.C-ALIANZA-E2-SSP-DA-LP-12/04 |
24/12/2004 |
$396,852.02 |
A20-1020 |
24 |
561 |
|
|
|
|
|
TOTAL |
|
$1,180,358.44 |
|
|
|
|
PROVEEDOR |
113766 GUEVARA OBREGON ROSA IMELDA |
|
|
|
58 |
ESCALIN.C-G.MENDIO-E1-OP-IS-18/04-AD |
14/12/2004 |
$77,520.47 |
M99-0871 |
60 |
191 |
|
|
|
|
|
TOTAL |
|
$77,520.47 |
|
|
|
|
PROVEEDOR |
113774 DESARROLLO INMOBILIARIO HABITACIO |
NAL,S.A.DE |
C.V. |
|
550 |
AG.POT.F-106-E1-OP-IS-04/04-IR |
14/12/2004 |
$297,022.05 |
M99-0885 |
60 |
189 |
|
551 |
AG.POT.F-106-E2-OP-IS-04/04-IR |
21/12/2004 |
$242,830.53 |
M99-0918 |
60 |
215 |
|
|
|
|
|
TOTAL |
|
$539,852.58 |
|
|
|
|
PROVEEDOR |
113877 GARZA TREVINO ILDELFONSO GUSTAVO |
|
|
|
911 |
TRAS.26 ARBOLES-E2-SSP-DA-CI-29/04 |
14/12/2004 |
$184,781.82 |
A20-0850 |
24 |
422 |
|
919 |
TRAS.63 ENCINOS-E1-SSP-DA-CI-29/04 |
14/12/2004 |
$324,523.06 |
A20-0849 |
24 |
422 |
|
934 |
REFOR.G.SA/S.AGUA-A-SSP-DA-LP-18/04 |
22/12/2004 |
$567,113.93 |
A20-1016 |
24 |
540 |
|
|
|
|
|
TOTAL |
|
$1,076,418.81 |
|
|
|
|
PROVEEDOR |
113951 CORPORACION CEREYRO,S.A.DE C.V. |
|
|
|
221 |
REGISTRO DE CONCRETO |
13/12/2004 |
$155,015.40 |
OC0-5330 |
1 |
53156 |
|
|
|
|
|
TOTAL |
|
$155,015.40 |
|
|
|
|
PROVEEDOR |
114145 AYALA RIOS RUBEN |
|
|
|
77 |
REM.SEC.AYU-E2-SSP-DA-CI-46/04 |
01/12/2004 |
$94,230.17 |
A20-0908 |
1 |
52884 |
|
78 |
REM.SEC.AYU-X1-SSP-DA-CI-46/04 |
01/12/2004 |
$209,702.47 |
A20-0909 |
1 |
52884 |
|
|
|
|
|
TOTAL |
|
$303,932.64 |
|
|
|
|
PROVEEDOR |
114186 PROVEEDORA P/LA CONSTRUCCION REGI |
OMONTANA,S |
.A.DE C |
|
1007 |
CABALL.C-REFO-E2-PR-RP-02/04-IR |
10/12/2004 |
$257,297.69 |
M99-0804 |
24 |
404 |
|
1013 |
CABALLER.C-REFO-E3-PR-RP-02/04-IR |
20/12/2004 |
$185,526.41 |
M99-0815 |
24 |
496 |
|
1016 |
ESCALIN.C-G.MENDIO-E1-OP-IS-08/04-IR |
10/12/2004 |
$221,890.35 |
M99-0840 |
60 |
179 |
|
|
|
|
|
TOTAL |
|
$664,714.45 |
|
|
|
|
PROVEEDOR |
114211 CONSTRUGRAMA, SA. DE CV. |
|
|
|
435 |
EQ.BOMB.D-N,C,S,P-A-SSP-DA-CI-52/04 |
30/12/2004 |
$311,386.21 |
A20-0957 |
1 |
53827 |
|
|
|
|
|
TOTAL |
|
$311,386.21 |
|
|
|
|
PROVEEDOR |
119057 DUCTO PUENTES S.A. DE C.V. |
|
|
|
1205 |
PAV.AV.S.NICO-A-SSP-DA-LP-17/04 |
22/12/2004 |
$627,309.50 |
A20-0951 |
24 |
544 |
|
|
|
|
|
TOTAL |
|
$627,309.50 |
|
|
|
|
PROVEEDOR |
119086 RAMIREZ VERASTEGUI ISIDRO RAMON |
|
|
|
1820 |
MONOLI-X1-SSP-DA-CI-13/04 |
01/12/2004 |
$184,969.02 |
A20-0907 |
24 |
301 |
|
1821 |
9 MONOLITOS-X2-SSP-DA-CI-13/04 |
29/12/2004 |
$17,130.81 |
A20-0988 |
1 |
53815 |
|
|
|
|
|
TOTAL |
|
$202,099.83 |
|
|
|
|
PROVEEDOR |
119175 MONTEMAYOR GONZALEZ ALEJANDRO |
|
|
|
1084 |
REH.ESC.J.NUNO-E1-OP-RP-ME-01/04-AD |
21/12/2004 |
$195,498.81 |
M99-0828 |
24 |
511 |
|
|
|
|
|
TOTAL |
|
$195,498.81 |
|
|
|
|
PROVEEDOR |
119182 PAVIMENTACIONES CAMINOS Y COMPACT |
ACIONES,S. |
A.DE C. |
|
4859 |
2000 TN. CARPETA ASFALTICA |
17/12/2004 |
$766,820.00 |
OC0-5424 |
24 |
487 |
|
|
|
|
|
TOTAL |
|
$766,820.00 |
|
|
|
|
PROVEEDOR |
119186 ROMO GARZA RODOLFO |
|
|
|
462 |
AG.POT.C-S.BERNA-E1-OP-IS-06/04-C |
20/12/2004 |
$198,948.21 |
M99-0881 |
60 |
203 |
|
465 |
AG.POT.C-S.BERNA-A1-OP-IS-06/04-C |
20/12/2004 |
$137,550.60 |
M99-0880 |
60 |
203 |
|
|
|
|
|
TOTAL |
|
$336,498.81 |
|
|
|
|
PROVEEDOR |
119205 DINAMICA OPERATIVA,S.A.DE C.V. |
|
|
|
3108 |
PTE.CANAL C-MIRASOL-E1-OP-RP-46/04-IR |
17/12/2004 |
$189,460.08 |
M99-0814 |
1 |
53405 |
|
|
|
|
|
TOTAL |
|
$189,460.08 |
|
|
|
|
PROVEEDOR |
122499 ELECTRICA CONTRY, SA. |
|
|
|
4287 |
3 POZOS C-A.SECO-X1-SSP-DA-CI-05/04-AD |
28/12/2004 |
$45,503.92 |
A20-0979 |
24 |
570 |
|
|
|
|
|
TOTAL |
|
$45,503.92 |
|
|
|
|
PROVEEDOR |
123012 CONSTRUCTORA PENA PALMA, S.A. DE |
C.V. |
|
|
9035 |
PAV.C-01-JUN-A1-OP-RP-21/04-IR |
20/12/2004 |
$192,702.38 |
M99-0622 |
24 |
504 |
|
9036 |
PAV.C-01-JUN-X1-OP-RP-21/04-IR |
20/12/2004 |
$64,020.36 |
M99-0623 |
24 |
504 |
|
|
|
|
|
TOTAL |
|
$256,722.74 |
|
|
|
|
PROVEEDOR |
123013 SELLOS Y PAVIMENTOS, S.A. |
|
|
|
10331 |
PAV.F-25-E2-OP-RP-45/04-IR |
30/12/2004 |
$150,676.08 |
M99-0861 |
1 |
53823 |
|
10332 |
PAV.F-25-E1-OP-RP-45/04-IR |
30/12/2004 |
$37,060.59 |
M99-0860 |
1 |
53823 |
|
10350 |
PAV.C-F-25-E3-OP-RP-45/04-IR |
30/12/2004 |
$72,308.11 |
M99-0912 |
1 |
53823 |
|
|
|
|
|
TOTAL |
|
$260,044.78 |
|
|
|
|
PROVEEDOR |
123028 HERCAN CONSTRUCCIONES, S.A. DE C. |
V. |
|
|
711 |
PAV.C-B.JUAREZ-E1-SSP-DA-CI-41/04 |
21/12/2004 |
$459,988.33 |
A20-0967 |
24 |
530 |
|
|
|
|
|
TOTAL |
|
$459,988.33 |
|
|
|
|
PROVEEDOR |
123037 CONSTRUCCIONES CUPRE,S.A. DE C.V. |
|
|
|
6378 |
PAV.D-C-A1-SSP-DA-CI-27/04 |
06/12/2004 |
$107,341.41 |
A20-0949 |
24 |
365 |
|
6413 |
PAV.C-MITRAS-E1-SSP-DA-CI-43/04 |
02/12/2004 |
$945,277.13 |
A20-0927 |
24 |
331 |
|
6414 |
PAV.C-MITRAS-A1-SSP-DA-CI-43/04 |
01/12/2004 |
$83,404.18 |
A20-0936 |
24 |
303 |
|
6415 |
PAV.C-MITRAS-E2-SSP-DA-CI-43/04 |
01/12/2004 |
$66,161.34 |
A20-0928 |
24 |
303 |
|
6416 |
PAV.C-MITRAS-A2-SSP-DA-CI-43/04 |
02/12/2004 |
$61,529.41 |
A20-0929 |
24 |
331 |
|
|
|
|
|
TOTAL |
|
$1,263,713.47 |
|
|
|
|
PROVEEDOR |
123058 CONDULINEAS,S.A. DE C.V. |
|
|
|
3755 |
DR.PLUV.R.FRIAS-E1-OP-RP-22/04-C |
22/12/2004 |
$618,656.81 |
M99-0625 |
24 |
545 |
|
3756 |
DR.PLUV.R.FR-A1-OP-RP-22/04-C |
22/12/2004 |
$38,777.31 |
M99-0651 |
24 |
545 |
|
3769 |
DR.PLUV.R.FR-X1-OP-RP-22/04-C |
22/12/2004 |
$139,626.76 |
M99-0650 |
24 |
545 |
|
3782 |
DR.PLUV.R.FR/LEO-E2-OP-RP-22/04-C |
22/12/2004 |
$633,242.53 |
M99-0742 |
24 |
545 |
|
3783 |
DR.PLUV.R.FR/LEO-A2-OP-RP-22/04-C |
22/12/2004 |
$75,149.13 |
M99-0743 |
24 |
545 |
|
3784 |
DR.PLUV.R.FR/LEO-X2-OP-RP-22/04-C |
22/12/2004 |
$35,895.15 |
M99-0744 |
24 |
545 |
|
|
|
|
|
TOTAL |
|
$1,541,347.69 |
|
|
|
|
PROVEEDOR |
123060 CONST. MAIZ MIER,S.A. DE C.V. |
|
|
|
15569 |
PAV.G.SA/L.ELI-TT-OP-RP-07/04-C |
10/12/2004 |
$1,293,591.63 |
M99-0807 |
24 |
410 |
|
|
|
|
|
TOTAL |
|
$1,293,591.63 |
|
|
|
|
PROVEEDOR |
123068 CONSTRUCTORA MONTEMAYOR CHAPA,S.A |
. |
|
|
1877 |
ANDADOR C-TREVI-X1-OP-IS-07/04-IR |
20/12/2004 |
$10,971.33 |
M99-0879 |
60 |
204 |
|
|
|
|
|
TOTAL |
|
$10,971.33 |
|
|
|
|
PROVEEDOR |
123073 DESARROLLO Y CONSTRUCCIONES URBAN |
AS,SA. |
|
|
7913 |
RAM.G.SA/2-ABR-TT-OP-RP-09/04-C |
10/12/2004 |
$11,483,878.28 |
M99-0806 |
24 |
419 |
|
|
|
|
|
TOTAL |
|
$11,483,878.28 |
|
|
|
|
PROVEEDOR |
123084 CAMINOS Y URB.NACIONALES,S.A. DE |
C.V. |
|
|
1838 |
DR.SANI.C-PROV.S.BERNA-E3-OP-IS-01/04-C |
14/12/2004 |
$34,980.34 |
M99-0839 |
60 |
184 |
|
|
|
|
|
TOTAL |
|
$34,980.34 |
|
|
|
|
PROVEEDOR |
123108 CONSTRUCCIONES SYD, S.A. DE C.V. |
|
|
|
1152 |
ESCALI.C-S.HEROI-E1-OP-IS-13/04-AD |
06/12/2004 |
$81,253.79 |
M99-0796 |
60 |
176 |
|
|
|
|
|
TOTAL |
|
$81,253.79 |
|
|
|
|
PROVEEDOR |
123147 CONSTRUCCIONES MAYVI,S.A. DE C.V. |
|
|
|
1850 |
ESCALIN.C-S.VENTANA-E1-OP-IS-12/04-AD |
13/12/2004 |
$77,967.79 |
M99-0829 |
60 |
180 |
|
1851 |
ESCALIN.C-S.VENTANA-A1-OP-IS-12/04-AD |
13/12/2004 |
$8,447.34 |
M99-0830 |
60 |
180 |
|
|
|
|
|
TOTAL |
|
$86,415.13 |
|
|
|
|
PROVEEDOR |
123192 CONSTRUCCIONES Y REMOD.GARCIA,S.A |
. DE CV |
|
|
2067 |
OF.PAS.PQ.TUC-X1-SSP-DA-CI-20/04 |
16/12/2004 |
$174,983.60 |
A20-0948 |
24 |
473 |
|
2081 |
OF.PASA.PQ.TUCA-E1-SSP-DA-CI-47/04 |
07/12/2004 |
$388,777.86 |
A20-0906 |
24 |
372 |
|
|
|
|
|
TOTAL |
|
$563,761.46 |
|
|
|
|
PROVEEDOR |
123194 OBRAS DE INGENIERIA LEON,S.A. DE |
C.V. |
|
|
557 |
DR.SANIT.C-INDEPE-A-OP-IS-28/04-AD |
20/12/2004 |
$23,387.94 |
M99-0838 |
60 |
205 |
|
|
|
|
|
TOTAL |
|
$23,387.94 |
|
|
|
|
PROVEEDOR |
123204 ORGANIZACION Y SERV.PARA LA CONST |
.SA CV |
|
|
1003 |
CAMELL.A.PERI-E1-SSP-DA-LP-06/04 |
10/12/2004 |
$309,902.32 |
A20-0953 |
24 |
411 |
|
1004 |
CAMELL.A.PERI-A1-SSP-DA-LP-06/04 |
10/12/2004 |
$35,343.65 |
A20-0954 |
24 |
411 |
|
1005 |
CAMELL.A.PERI-X1-SSP-DA-LP-06/04 |
10/12/2004 |
$18,786.84 |
A20-0955 |
24 |
411 |
|
1006 |
CAMELL.A.PERI-E2-SSP-DA-LP-06/04 |
10/12/2004 |
$363,969.81 |
A20-0956 |
24 |
411 |
|
1009 |
CAMELL.AN.PERIF-A2-SSP-DA-LP-06/04 |
10/12/2004 |
$55,299.54 |
A20-0961 |
24 |
411 |
|
|
|
|
|
TOTAL |
|
$783,302.16 |
|
|
|
|
PROVEEDOR |
123231 GUAJARDO Y ASOCS.CONSTRUCTORA, S. |
A. |
|
|
2487 |
DR.PLUV.C-H.FERROCA-E1-OP-RP-18/04-C |
23/12/2004 |
$449,759.71 |
M99-0716 |
1 |
53523 |
|
|
|
|
|
TOTAL |
|
$449,759.71 |
|
|
|
|
PROVEEDOR |
123232 CONSTRUCTORA ROGACU, S.A. |
|
|
|
1626 |
ESCALIN.C-G.MENDIO-A-OP-IS-24/04-IR |
20/12/2004 |
$78,815.91 |
M99-0808 |
60 |
209 |
|
1637 |
DR.PLUV.F-45-E1-OP-RP-50/04-IR |
21/12/2004 |
$650,666.51 |
M99-0855 |
24 |
531 |
|
|
|
|
|
TOTAL |
|
$729,482.42 |
|
|
|
|
PROVEEDOR |
123244 COMAR CONSTRUCCIONES, SA. DE CV. |
|
|
|
1126 |
9 PZS.C-SOLI-E1-SSP-DA-LP-08/04 |
16/12/2004 |
$969,665.90 |
A20-0831 |
24 |
474 |
|
1128 |
REM.OF.SER.PUB-E1-SSP-DA-LP-04/04 |
16/12/2004 |
$486,507.37 |
A20-0860 |
24 |
474 |
|
1134 |
9 PZS. B-DEL PRADO-E2-SSP-DA-LP-08/04 |
16/12/2004 |
$356,763.42 |
A20-0897 |
24 |
474 |
|
1152 |
MONUM,PIPORRO-E1-SSP-DA-07/04-AD |
16/12/2004 |
$181,329.53 |
A20-0969 |
24 |
474 |
|
1154 |
REM.OF.SERV.PUB-E2-SSP-DA-LP-04/04 |
16/12/2004 |
$938,213.69 |
A20-0973 |
24 |
474 |
|
1155 |
OF.SER.PUB-A2-SSP-DA-LP-04/04 |
16/12/2004 |
$46,401.72 |
A20-0982 |
24 |
474 |
|
1159 |
OF.SER.PUB-X1-SSP-DA-LP-04/04 |
16/12/2004 |
$607,540.75 |
A20-0981 |
24 |
474 |
|
|
|
|
|
TOTAL |
|
$3,586,422.38 |
|
|
|
|
PROVEEDOR |
123255 ABC Y CONSTRUCCIONES, SA. DE CV. |
|
|
|
1579 |
DR.PLUV.SANJEMO-E3-OP-RP-12/04-C |
21/12/2004 |
$315,003.62 |
M99-0883 |
24 |
512 |
|
|
|
|
|
TOTAL |
|
$315,003.62 |
|
|
|
|
PROVEEDOR |
123262 CONSTRUCCIONES DYNAMO, SA. |
|
|
|
1060 |
MNTO.AR.VERDES-E6-SADA/22/04 |
10/12/2004 |
$1,069,262.78 |
A20-0959 |
24 |
412 |
|
1061 |
MNTO.AR.VERD.A1-SADA/22/04 |
10/12/2004 |
$229,522.65 |
A20-0960 |
24 |
412 |
|
1075 |
DR.PLUV.C-CDS.JERONI-E2-OP-RP-13/04-C |
24/12/2004 |
$228,891.70 |
M99-0929 |
24 |
563 |
|
|
|
|
|
TOTAL |
|
$1,527,677.13 |
|
|
|
|
PROVEEDOR |
123266 INFRAEST.DE VIVIENDA REGIOMONT.SA |
. |
|
|
301 |
BARDA ALAMEY-A-PR-RP-05/04-IR |
23/12/2004 |
$298,156.88 |
M99-0681 |
1 |
53524 |
|
|
|
|
|
TOTAL |
|
$298,156.88 |
|
|
|
|
PROVEEDOR |
123280 LOPEZ GARZA ANA ELIZABETH |
|
|
|
705 |
PAV.C-INDUST-E1-OP-IS-09/04-AD |
14/12/2004 |
$73,223.51 |
M99-0875 |
60 |
185 |
|
707 |
PAV.C-INDUST.E1-OP-IS-09/04-AD |
21/12/2004 |
$28,579.98 |
M99-0941 |
60 |
212 |
|
|
|
|
|
TOTAL |
|
$101,803.49 |
|
|
|
|
PROVEEDOR |
123282 CONSTRUCCIONES Y DER. MTY. SA. |
|
|
|
1695 |
DR.SANIT.C-PROVILEON-E1-OP-IS-03/04-C |
13/12/2004 |
$461,800.49 |
M99-0836 |
60 |
181 |
|
|
|
|
|
TOTAL |
|
$461,800.49 |
|
|
|
|
PROVEEDOR |
123291 FLORES GARZA LUIS ING. |
|
|
|
1564 |
DR.PLUV.C-H.FERR-E1-OP-RP-20/04-C |
03/12/2004 |
$110,225.39 |
M99-0704 |
24 |
356 |
|
1570 |
DR.PLUV.C-H.FERROCA-E2-OP-RP-20/04-C |
03/12/2004 |
$291,320.26 |
M99-0766 |
24 |
356 |
|
1577 |
PAV.C-CROC-A-OP-RP-58/04-IR |
21/12/2004 |
$446,394.92 |
M99-0811 |
24 |
513 |
|
1578 |
PAV.C-HIDALGO-A-OP-IS-23/04-IR |
14/12/2004 |
$73,764.17 |
M99-0813 |
60 |
187 |
|
1582 |
PAV.C-REF.URB-E3-OP-RP-32/04-IR |
21/12/2004 |
$119.31 |
M99-0864 |
24 |
513 |
|
|
|
|
|
TOTAL |
|
$921,824.05 |
|
|
|
|
PROVEEDOR |
123293 EDIFICADORA TAMATAN, SA. |
|
|
|
1004 |
DR.SANIT.C-PD.AGUILA-X1-OP-IS-06/02-AD |
23/12/2004 |
$38,581.84 |
M99-0928 |
19 |
299 |
|
1029 |
DR.SANI.C-PD.AGILA-E3-OP-IS-06/02-AD |
14/12/2004 |
$13,441.05 |
M99-0819 |
60 |
190 |
|
1030 |
DR.SANI.C-PD.AGUILA-A1-OP-IS-06/02-AD |
21/12/2004 |
$2,215.57 |
M99-0898 |
19 |
298 |
|
|
|
|
|
TOTAL |
|
$54,238.46 |
|
|
|
|
PROVEEDOR |
123307 CONSTRUCTORA JOMABE, SA. |
|
|
|
1330 |
MURO DREN.PQ.CAN-X1-SSP-DA-LP-09/04 |
02/12/2004 |
$88,625.38 |
A20-0915 |
24 |
332 |
|
1331 |
MURO DR.SANI.P.CANO-E5-SSP-DA-LP-09/04 |
02/12/2004 |
$942,576.84 |
A20-0937 |
24 |
332 |
|
1332 |
MURO DR.SANI.P.CANO-A2-SSP-DA-LP-09/04 |
02/12/2004 |
$54,752.63 |
A20-0938 |
24 |
332 |
|
1338 |
MUR.DR.SANI-E6-SSP-DA-LP-09/04 |
28/12/2004 |
$493,201.21 |
A20-0990 |
24 |
571 |
|
1339 |
MUR.DR.SANI-A3-SSP-DA-LP-09/04 |
28/12/2004 |
$68,083.75 |
A20-0991 |
24 |
571 |
|
|
|
|
|
TOTAL |
|
$1,647,239.81 |
|
|
|
|
PROVEEDOR |
123309 VARGAS TORRES Y ASOCIADOS, SA. |
|
|
|
697 |
ESTU.EJE P.GZZ/S.BARBARA |
03/12/2004 |
$198,950.00 |
M99-0522 |
1 |
53020 |
|
|
|
|
|
TOTAL |
|
$198,950.00 |
|
|
|
|
PROVEEDOR |
123310 LANKENAU DE LA GARZA ALBERTO |
|
|
|
2838 |
TOPOGRAF.GONZA/FLETEROS |
02/12/2004 |
$120,750.00 |
M99-0736 |
24 |
333 |
|
|
|
|
|
TOTAL |
|
$120,750.00 |
|
|
|
|
PROVEEDOR |
123315 GRUPO CONSTRUCTOR JANUS, SA. |
|
|
|
550 |
CAMELL.C-P.RESI-E1-SSP-DA-LP-07/04 |
06/12/2004 |
$321,439.90 |
A20-0942 |
24 |
366 |
|
552 |
CAMELL.C-P.RESI-A1-SSP-DA-LP-07/04 |
06/12/2004 |
$1,208.42 |
A20-0943 |
24 |
366 |
|
553 |
PASE.FID.VQZ-E2-SSP-DA-LP-03/04 |
10/12/2004 |
$795,024.07 |
A20-0944 |
24 |
413 |
|
558 |
PAS.F.VQZ-A1-SSP-DA-LP-03/04 |
10/12/2004 |
$160,649.32 |
A20-0958 |
24 |
413 |
|
|
|
|
|
TOTAL |
|
$1,278,321.71 |
|
|
|
|
PROVEEDOR |
123316 CONSTRUCTORA Y URBANIZADORA JE-FE |
, SA. |
|
|
345 |
DR.SANI.C-NOG.DLS-A-OP-IS-23/04-AD |
03/12/2004 |
$13,807.77 |
M99-0750 |
60 |
174 |
|
346 |
DR.SANI.C-NOG.DLS-A-OP-IS-24/04-AD |
03/12/2004 |
$13,837.95 |
M99-0748 |
60 |
174 |
|
349 |
DR.SANIT-C-NDL.SIERR-E1-OP-IS-14/04-AD |
13/12/2004 |
$77,833.18 |
M99-0834 |
60 |
182 |
|
351 |
DR.SANIT-C-NDL.SIERR-E2-OP-IS-14/04-AD |
13/12/2004 |
$26,595.36 |
M99-0835 |
60 |
182 |
|
|
|
|
|
TOTAL |
|
$132,074.26 |
|
|
|
|
PROVEEDOR |
123343 RAMIREZ GUEVARA FRANCISCO MARTIN |
|
|
|
413 |
PAV.C-CONTRY-A-SSP-DA-CI-53/04 |
13/12/2004 |
$244,703.55 |
A20-0886 |
1 |
53155 |
|
|
|
|
|
TOTAL |
|
$244,703.55 |
|
|
|
|
PROVEEDOR |
123346 INST.ELECTROMECANICAS MTY, SA. |
|
|
|
5775 |
ALUMB.CCARM.SER-A-OP-IS-22/04-IR |
14/12/2004 |
$183,153.40 |
M99-0798 |
60 |
186 |
|
5776 |
ALUMB.C-PRESITA-A-OP-IS-21/04-IR |
14/12/2004 |
$143,209.30 |
M99-0799 |
60 |
186 |
|
|
|
|
|
TOTAL |
|
$326,362.70 |
|
|
|
|
PROVEEDOR |
123359 ASES.EN CONT.DE CAL.CONSTR.Y SERV |
.DE ING.SA |
. |
|
1619 |
TOPOG.ARR.SECO |
27/12/2004 |
$33,877.39 |
M99-0628 |
1 |
53703 |
|
|
|
|
|
TOTAL |
|
$33,877.39 |
|
|
|
|
PROVEEDOR |
123364 BUFETE URBANISTICO, SA. |
|
|
|
283 |
CAMELL.PTA.SOL-E4-SSP-DA-LP-01/04 |
02/12/2004 |
$418,526.79 |
A20-0939 |
24 |
334 |
|
284 |
CAMELL.PTA.SOL-A3-SSP-DA-LP-01/04 |
02/12/2004 |
$349,499.84 |
A20-0940 |
24 |
334 |
|
285 |
OF.TESOR-X1-SSP-DA-CI-44/04 |
02/12/2004 |
$366,154.81 |
A20-0941 |
24 |
334 |
|
|
|
|
|
TOTAL |
|
$1,134,181.44 |
|
|
|
|
PROVEEDOR |
123366 ORGANIZACION 59-64, SA. |
|
|
|
681 |
ESCALIN.C-LDLU.MODELO-E2-OP-IS-03/04-AD |
20/12/2004 |
$15,976.43 |
M99-0872 |
60 |
206 |
|
|
|
|
|
TOTAL |
|
$15,976.43 |
|
|
|
|
PROVEEDOR |
123390 CHAPA KRUEGER AUGUSTO CESAR |
|
|
|
2101 |
PAV.C-INDUST-A-OP-IS-30/04-AD |
03/12/2004 |
$54,112.34 |
M99-0800 |
60 |
175 |
|
2102 |
PAV.C-INDUST-A-OP-IS-29/04-AD |
03/12/2004 |
$19,170.46 |
M99-0801 |
60 |
175 |
|
2110 |
PAV.C-INDUST.-E1-OP-IS-30/04-AD |
21/12/2004 |
$8,841.15 |
M99-0919 |
60 |
216 |
|
2114 |
PAV.C-INDUST.-E1-OP-IS-29/04-AD |
21/12/2004 |
$18,125.72 |
M99-0924 |
60 |
216 |
|
|
|
|
|
TOTAL |
|
$100,249.67 |
|
|
|
|
PROVEEDOR |
123392 AXIS CONSTRUCCIONES DE MTY, SA. |
|
|
|
562 |
MORELOS-E1-OP-RP-15/04-C |
03/12/2004 |
$82,577.30 |
M99-0690 |
24 |
357 |
|
563 |
MORELOS-E2-OP-RP-15/04-C |
03/12/2004 |
$108,496.92 |
M99-0691 |
24 |
357 |
|
573 |
PAV.C-REFO-A-OP-RP-54/04-IR |
21/12/2004 |
$299,589.45 |
M99-0780 |
24 |
515 |
|
|
|
|
|
TOTAL |
|
$490,663.67 |
|
|
|
|
PROVEEDOR |
123394 MG UNIDAD TECNICA, SA. |
|
|
|
667 |
PAV.ANT.CAM.SANTI-A-OP-RP-49/04-IR |
03/12/2004 |
$86,732.52 |
M99-0759 |
24 |
358 |
|
669 |
LO.PTE.G-SA/SEN-TT-OP-RP-10/04-C |
10/12/2004 |
$7,895,020.15 |
M99-0778 |
24 |
414 |
|
670 |
REMP.G.SA/SEND-TT-OP-RP-10/04-C |
10/12/2004 |
$5,149,602.39 |
M99-0809 |
24 |
414 |
|
673 |
PAV.CAM.CALERAS-E1-OP-RP-49/04-IR |
28/12/2004 |
$193,213.25 |
M99-0857 |
24 |
572 |
|
|
|
|
|
TOTAL |
|
$13,324,568.31 |
|
|
|
|
PROVEEDOR |
123396 CONSTRUCTORA DIALGO, SA. |
|
|
|
1208 |
PAV.C-T.CHICO-A1-OP-RP-22/04-IR |
27/12/2004 |
$120,160.90 |
M99-0738 |
24 |
567 |
|
1209 |
PAV.C-T.CHICO-X1-OP-RP-22/04-IR |
27/12/2004 |
$136,411.79 |
M99-0737 |
24 |
567 |
|
|
|
|
|
TOTAL |
|
$256,572.69 |
|
|
|
|
PROVEEDOR |
123398 RODADA CONSTRUCCIONES, SA. |
|
|
|
449 |
PAV.C-REMATES-A1-OP-RP-11/04-IR |
16/12/2004 |
$80,998.20 |
M99-0640 |
24 |
475 |
|
484 |
ALBAN.D-C-E1-SSP-DA-CI-08/07 |
23/12/2004 |
$51,734.44 |
A20-1035 |
24 |
557 |
|
|
|
|
|
TOTAL |
|
$132,732.64 |
|
|
|
|
PROVEEDOR |
123400 CONST.URB.Y PROY.RDZ.SANDOVAL, SA |
. |
|
|
464 |
ALBANI.PQ.D-S-E3-SSP-DA-CI-03/04 |
07/12/2004 |
$20,495.92 |
A20-0926 |
24 |
373 |
|
467 |
PAC.C-REMAT-E1-OP-RP-28/04-IR |
10/12/2004 |
$47,721.59 |
M99-0794 |
24 |
415 |
|
469 |
PAV.C-REMATES-E2-OP-RP-28/04-IR |
10/12/2004 |
$206,307.88 |
M99-0795 |
24 |
415 |
|
477 |
OF.SEDUE-A1-SSP-DA-LP-11/04 |
23/12/2004 |
$77,913.79 |
A20-1034 |
24 |
558 |
|
|
|
|
|
TOTAL |
|
$352,439.18 |
|
|
|
|
PROVEEDOR |
123402 DE LEON RODRIGUEZ JOSE JONAS |
|
|
|
1691 |
PAV.C-BUROCR-A3-OP-FM-10/02-IR |
21/12/2004 |
$25,854.82 |
M99-0891 |
24 |
516 |
|
1692 |
PAV.C-BUROCR-E4-OP-FM-10/02-IR |
21/12/2004 |
$4,289.60 |
M99-0889 |
24 |
516 |
|
1694 |
PAV.C-B.MPALES-X1-OP-FM-10/02-IR |
21/12/2004 |
$40,750.06 |
M99-0892 |
24 |
516 |
|
1695 |
PAV.C-B.MPALES-A4-OP-FM-10/02-IR |
21/12/2004 |
$34,115.30 |
M99-0886 |
24 |
516 |
|
1696 |
PAV.C-PD.AGUIL-E3-OP-RP-38/04-IR |
21/12/2004 |
$92,797.76 |
M99-0888 |
24 |
516 |
|
|
|
|
|
TOTAL |
|
$197,807.54 |
|
|
|
|
PROVEEDOR |
123403 CAVAZOS REMODELACIONES, SA. |
|
|
|
268 |
PAV.C-REMAT-A-OP-RP-56/04-IR |
23/12/2004 |
$496,203.70 |
M99-0842 |
1 |
53528 |
|
|
|
|
|
TOTAL |
|
$496,203.70 |
|
|
|
|
PROVEEDOR |
123405 INGENIERIA INTEGRAL DELMO, SA. |
|
|
|
144 |
REH.ESC.C-LD.MIRADOR-A-OP-RP-ME-09/04-AD |
10/12/2004 |
$53,402.87 |
M99-0779 |
24 |
416 |
|
146 |
ESC.I.ARAMBU-A-OP-RP-ME-10/04-AD |
10/12/2004 |
$47,232.26 |
M99-0810 |
24 |
416 |
|
147 |
PROY.LIV/LEON-E1-OP-RP-12/04-AD |
10/12/2004 |
$57,652.57 |
M99-0788 |
24 |
416 |
|
|
|
|
|
TOTAL |
|
$158,287.70 |
|
|
|
|
PROVEEDOR |
123407 CONSTRUCTORA URDIALES, SA. |
|
|
|
1407 |
AG.POT.C-B.MPALES-E3-OP-IS-62/01-IR |
14/12/2004 |
$28,798.50 |
M99-0664 |
1 |
53211 |
|
|
|
|
|
TOTAL |
|
$28,798.50 |
|
|
|
|
PROVEEDOR |
123413 EDIFICACIONES CIEN, SA. |
|
|
|
834 |
PAV.C.REMATES-E1-OP-RP-37/04-IR |
21/12/2004 |
$31,522.30 |
M99-0669 |
24 |
517 |
|
838 |
PAV.C.REMATES-A2-OP-RP-37/04-IR |
21/12/2004 |
$17,304.75 |
M99-0672 |
24 |
517 |
|
|
|
|
|
TOTAL |
|
$48,827.05 |
|
|
|
|
PROVEEDOR |
123415 CRISTO INGENIEROS Y ASOCIADOS, SA |
. |
|
|
135 |
PROY.PTE.G.SA/SEND-ET-OP-RP-09/04-AD |
10/12/2004 |
$195,518.54 |
M99-0555 |
24 |
417 |
|
137 |
PROY.PTE.G.SA/ELIZ-PU-OP-RP-07/04-AD-BIS |
10/12/2004 |
$195,518.54 |
M99-0590 |
24 |
417 |
|
|
|
|
|
TOTAL |
|
$391,037.08 |
|
|
|
|
PROVEEDOR |
123423 CEPEDA CARDONA ALBERTO MANUEL |
|
|
|
739 |
TOPOGRAF.LEONES/R.FRI |
07/12/2004 |
$33,681.20 |
M99-0724 |
24 |
374 |
|
740 |
TOPOGRAF.BLVD.ACAPULCO |
07/12/2004 |
$87,571.12 |
M99-0725 |
24 |
374 |
|
741 |
TOPOGRAF.L.CARD/P.REFO. |
07/12/2004 |
$50,521.80 |
M99-0726 |
24 |
374 |
|
|
|
|
|
TOTAL |
|
$171,774.12 |
|
|
|
|
PROVEEDOR |
123424 PLANEACION INMOBILIARIA VIBE, SA. |
|
|
|
410 |
PAV.C-ILUSION-E2-OP-RP-47/04-IR |
14/12/2004 |
$548,794.14 |
M99-0781 |
24 |
421 |
|
411 |
PAV.C-ILUSION-A1-OP-RP-47/04-IR |
30/12/2004 |
$81,402.99 |
M99-0906 |
24 |
577 |
|
|
|
|
|
TOTAL |
|
$630,197.13 |
|
|
|
|
PROVEEDOR |
123426 GONVEL, SA. |
|
|
|
851 |
ANDAD.JI.RAM-X1-SSP-DA-CI-18/04 |
16/12/2004 |
$18,703.68 |
A20-0950 |
24 |
470 |
|
861 |
ESCALINAT.C-LDLU.MODE-A-OP-IS-06/04-AD |
08/12/2004 |
$35,296.08 |
M99-0797 |
60 |
177 |
|
866 |
PAV.C-MITRAS-A-SSP-DA-CI-54/04 |
02/12/2004 |
$56,198.50 |
A20-0933 |
24 |
335 |
|
876 |
ESCALIN.C-LDLU.MOD-E1-OP-IS-06/04-AD |
13/12/2004 |
$72,488.67 |
M99-0837 |
60 |
183 |
|
877 |
ESCALIN.C-LDLU.MODE-X1-OP-IS-06/04-AD |
23/12/2004 |
$1,311.67 |
M99-0940 |
60 |
217 |
|
|
|
|
|
TOTAL |
|
$183,998.60 |
|
|
|
|
PROVEEDOR |
123429 DISENO MATERIALES Y CONSTRUCCIONE |
S, SA. |
|
|
3599 |
ENL.CIUDA.PQ.TU-A-OP-RP-59/04-IR |
23/12/2004 |
$479,504.72 |
M99-0853 |
1 |
53529 |
|
|
|
|
|
TOTAL |
|
$479,504.72 |
|
|
|
|
PROVEEDOR |
123430 MORALES HERNANDEZ FRANCISCO |
|
|
|
2384 |
TOPOG.DR.PLIV.C-M.CUMBRES |
01/12/2004 |
$17,250.00 |
M99-0634 |
24 |
304 |
|
2385 |
PROYDR.PLIV.AV.F.VQZ |
01/12/2004 |
$13,800.00 |
M99-0635 |
24 |
304 |
|
|
|
|
|
TOTAL |
|
$31,050.00 |
|
|
|
|
PROVEEDOR |
123431 MONUMENTOS PUBLICITARIOS, S.R.L. |
DE C.V. |
|
|
76 |
REU.PTE.PEA.MADERO-E1-OP-RP-08/04-AD |
16/12/2004 |
$347,410.88 |
M99-0833 |
24 |
471 |
|
|
|
|
|
TOTAL |
|
$347,410.88 |
|
|
|
|
PROVEEDOR |
123432 JIMENEZ RIVERA BENIGNO |
|
|
|
112 |
LAVANTAMI.H.FERROCARR. |
01/12/2004 |
$27,922.00 |
M99-0728 |
24 |
305 |
|
117 |
TOPOGRA.ANTIG.ARR.T.CHICO |
01/12/2004 |
$83,720.00 |
M99-0731 |
24 |
305 |
|
|
|
|
|
TOTAL |
|
$111,642.00 |
|
|
|
|
PROVEEDOR |
123437 RONQUILLO LOPEZ DAVID |
|
|
|
318 |
PZA.EL ROBLE-E2-SSP-DA-CI-32/04 |
27/12/2004 |
$171,854.47 |
A20-0998 |
24 |
568 |
|
319 |
PZA.EL ROBLE-A1-SSP-DA-CI-32/04 |
27/12/2004 |
$44,204.07 |
A20-0999 |
24 |
568 |
|
|
|
|
|
TOTAL |
|
$216,058.54 |
|
|
|
|
PROVEEDOR |
123440 CANTU GARZA ALBERTO |
|
|
|
206 |
PZS.C-S.MARTIN-E2-SSP-DA-CI-37/04 |
24/12/2004 |
$230,510.38 |
A20-1022 |
24 |
564 |
|
207 |
PZS.C-S.MARTIN-A1-SSP-DA-CI-37/04 |
24/12/2004 |
$99,501.85 |
A20-1023 |
24 |
564 |
|
|
|
|
|
TOTAL |
|
$330,012.23 |
|
|
|
|
PROVEEDOR |
123441 CASTILLO SANTIBANEZ LUIS GERARDO |
|
|
|
127 |
TOPOGRAF.LINCOLN/PELICANO |
01/12/2004 |
$66,125.00 |
M99-0732 |
24 |
306 |
|
|
|
|
|
TOTAL |
|
$66,125.00 |
|
|
|
|
PROVEEDOR |
123442 INCOTEC DEL NORTE, SA. |
|
|
|
512 |
PAV.C-A.REY-A1-OP-IS-13/04-IR |
21/12/2004 |
$40,897.00 |
M99-0922 |
60 |
213 |
|
513 |
PAV.C-A.REYES-E2-OP-IS-13/04-IR |
21/12/2004 |
$16,372.51 |
M99-0921 |
60 |
213 |
|
514 |
PAV.C-A.REY-A2-OP-IS-13/04-IR |
21/12/2004 |
$1,902.75 |
M99-0923 |
60 |
213 |
|
515 |
PAV.C-A.REYES-E1-OP-IS-13/04-IR |
21/12/2004 |
$99,751.10 |
M99-0920 |
60 |
213 |
|
|
|
|
|
TOTAL |
|
$158,923.36 |
|
|
|
|
PROVEEDOR |
123444 CIA.MEX.DE DEMOLICIONES Y VOLADUR |
AS, SA. |
|
|
2512 |
COLADO G.SA/2-ABR-E6-OP-RP-08/04-C |
01/12/2004 |
$808,407.63 |
M99-0768 |
24 |
307 |
|
2513 |
COLAD.G.SA/2-ABR-X1-OP-RP-08/04-C |
03/12/2004 |
$939,366.40 |
M99-0793 |
24 |
359 |
|
2516 |
PTE.G.SA/2-ABR-E7-OP-RP-08/04-C |
22/12/2004 |
$434,242.58 |
M99-0863 |
24 |
552 |
|
2517 |
PTE.G.SA/2-ABR-A4-OP-RP-08/04-C |
22/12/2004 |
$168,792.42 |
M99-0884 |
24 |
552 |
|
|
|
|
|
TOTAL |
|
$2,350,809.03 |
|
|
|
|
PROVEEDOR |
123445 DE LEON Y LEAL CONSTRUCCIONES, SA |
. |
|
|
62 |
REH.ESC.J.MARTI-A-OP-RP-ME-14/04-AD |
21/12/2004 |
$59,342.48 |
M99-0787 |
24 |
518 |
|
65 |
REH.ESC.E.G.SADA-E1-OP-RP-ME-15/04-AD |
21/12/2004 |
$14,694.40 |
M99-0825 |
24 |
518 |
|
|
|
|
|
TOTAL |
|
$74,036.88 |
|
|
|
|
PROVEEDOR |
123446 SAGO CONSTRUCC.Y URBANIZACIONES, |
SA. |
|
|
12 |
ESCALINAT.C-G.MENDIO-E1-OP-IS-12/04-IR |
08/12/2004 |
$276,581.85 |
M99-0831 |
60 |
178 |
|
15 |
ESCALIN.C-G.MENDIO-A-OP-IS-32/04-AD |
20/12/2004 |
$53,380.29 |
M99-0844 |
60 |
210 |
|
|
|
|
|
TOTAL |
|
$329,962.14 |
|
|
|
|
PROVEEDOR |
123447 JAIMES QUINTANILLA RICARDO |
|
|
|
707 |
PAV.C-INDUST-E1-OP-IS-07/04-AD |
14/12/2004 |
$58,957.08 |
M99-0682 |
60 |
188 |
|
735 |
DR.PLUV.C-H.FERROCA-E2-OP-RP-19/04-C |
02/12/2004 |
$508,288.29 |
M99-0769 |
24 |
336 |
|
736 |
ANDADOR C-INDUST-A1-OP-IS-07/04-AD |
14/12/2004 |
$14,818.51 |
M99-0802 |
60 |
188 |
|
|
|
|
|
TOTAL |
|
$582,063.88 |
|
|
|
|
PROVEEDOR |
123453 RAMOS IMPER-AISLANTES, SA |
|
|
|
198 |
PAV.C-INDUST-A1-OP-IS-05/04-AD |
20/12/2004 |
$9,112.93 |
M99-0877 |
60 |
207 |
|
199 |
PAV.C-INDUST-X1-OP-IS-05/04-AD |
20/12/2004 |
$32,846.80 |
M99-0878 |
60 |
207 |
|
|
|
|
|
TOTAL |
|
$41,959.73 |
|
|
|
|
PROVEEDOR |
123454 GARZA ADAME RAFAEL WENCESLAO |
|
|
|
111 |
PAV.C-7-NOV-A-OP-IS-22/04-AD |
20/12/2004 |
$24,281.18 |
M99-0882 |
60 |
208 |
|
|
|
|
|
TOTAL |
|
$24,281.18 |
|
|
|
|
PROVEEDOR |
123456 OBRAS Y SERVICIOS DEL NORTE, SA. |
|
|
|
1524 |
ESCALIN.C-S.VENTA-E1-OP-IS-16/04-AD |
21/12/2004 |
$67,791.35 |
M99-0916 |
60 |
214 |
|
1525 |
ESCALIN.C-S.VENT-A1-OP-IS-16/04-AD |
21/12/2004 |
$40,131.81 |
M99-0917 |
60 |
214 |
|
|
|
|
|
TOTAL |
|
$107,923.16 |
|
|
|
|
PROVEEDOR |
123457 KONEDI, SA. DE CV. |
|
|
|
523 |
ESCALIN.C-G.MENDIOL-E1-OP-IS-19/04-AD |
20/12/2004 |
$75,036.89 |
M99-0873 |
60 |
211 |
|
524 |
ESCALIN.C-G.MENDIOL-A1-OP-IS-19/04-AD |
20/12/2004 |
$9,928.85 |
M99-0874 |
60 |
211 |
|
|
|
|
|
TOTAL |
|
$84,965.74 |
|
|
|
|
PROVEEDOR |
123458 CONSTRUCCIONES PERMELL, SA. |
|
|
|
1481 |
REH.ESC.J.SARABIA-E1-OP-RP-ME-04/04-AD |
21/12/2004 |
$87,665.13 |
M99-0826 |
24 |
520 |
|
1482 |
REH.ESC.BARR.MODERNO-E1-OP-RP-ME-03/04-A |
21/12/2004 |
$76,046.26 |
M99-0827 |
24 |
520 |
|
1488 |
REH.ESC.A.M.DOMIN-A-OP-RP-ME-17/04-AD |
21/12/2004 |
$56,752.14 |
M99-0845 |
24 |
520 |
|
1489 |
ESC.M.OCAMPO-E1-OP-RP-ME-05/04-AD |
28/12/2004 |
$103,285.36 |
M99-0914 |
24 |
573 |
|
|
|
|
|
TOTAL |
|
$323,748.89 |
|
|
|
|
PROVEEDOR |
123459 VILLARREAL MENDOZA, TRISTAN, RDZ. |
Y ASOC.SC. |
|
|
375 |
ANAL.ESQUE.LICITA.PROY.VIA-2005 |
17/12/2004 |
$69,000.00 |
M99-0723 |
1 |
53410 |
|
|
|
|
|
TOTAL |
|
$69,000.00 |
|
|
|
|
PROVEEDOR |
123460 COMER.ACEROS Y CONSTRUCC.EL TERRE |
RO, SA. |
|
|
31058 |
PZOS.PROF.DELEG-A-SSP-DA-LP-15/04 |
16/12/2004 |
$553,925.08 |
A20-0932 |
24 |
472 |
|
|
|
|
|
TOTAL |
|
$553,925.08 |
|
|
|
|
PROVEEDOR |
123463 INFRAESTRUC.Y CONSTRUCCIONES GARC |
IA, SA. |
|
|
21 |
PLAT.ACCESO M.PR/ZAR-A-OP-RP-53/04-IR |
21/12/2004 |
$100,586.87 |
M99-0749 |
24 |
521 |
|
|
|
|
|
TOTAL |
|
$100,586.87 |
|
|
|
|
PROVEEDOR |
123465 NORTEC INDUSTRIAL, SA. |
|
|
|
1555 |
PAV.C-REMATE-A-OP-RP-55/04-IR |
23/12/2004 |
$438,301.07 |
M99-0841 |
1 |
53530 |
|
|
|
|
|
TOTAL |
|
$438,301.07 |
|
|
|
|
PROVEEDOR |
123466 ORGANIZACION GEMAR, SA. |
|
|
|
326 |
PAV.C-CROC-A-OP-RP-57/04-IR |
23/12/2004 |
$363,002.39 |
M99-0843 |
1 |
53525 |
|
|
|
|
|
TOTAL |
|
$363,002.39 |
|
|
|
|
PROVEEDOR |
125384 FOMENTO EXPRESS HABITAT, S.A. DE |
C.V. |
|
|
270 |
ANTICIPO 30% CONST. 18 VIVIENDAS |
17/12/2004 |
$328,152.75 |
M99-0896 |
1 |
53422 |
|
|
|
|
|
TOTAL |
|
$328,152.75 |
|
|
|
|
PROVEEDOR |
210000 COMISION FEDERAL DE ELECTRICIDAD |
|
|
|
11156527 |
COMP.CH-51902 REUB.POSTES GZA.S. SALTO D |
16/12/2004 |
$45,307.04 |
11156527 |
50 |
0 |
1 |
11159195 |
COMP.CH-52631 REUB.POSTES GZA.SADA Y SEN |
02/12/2004 |
$17,739.61 |
11159195 |
50 |
0 |
1 |
11159197 |
COMP.CH-52630 REUB.LINEAS ELEC.GZA.S.Y 2 |
02/12/2004 |
$21,825.49 |
11159197 |
50 |
0 |
1 |
|
|
|
|
TOTAL |
|
$84,872.14 |
|
|
|
|
|
|
|
TOTAL GENERAL |
|
$70,357,606.71 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|