| TESORERIA MUNICIPAL DE MONTERREY | |||||||
| DIRECCION DE EGRESOS | |||||||
| PAGOS DICIEMBRE-2004 | |||||||
| FACTURA | DESCRIPCION | FECHA PAGO | IMPORTE | ORDEN | BCO | CHEQUE | |
| PROVEEDOR | 110036 SEMEX,S.A. | ||||||
| 42550 | SEMAFOR-G.SA/S.AGUA-E1-OP-RP-11/04-C | 17/12/2004 | $1,159,101.52 | M99-0771 | 24 | 477 | |
| 42723 | SENAL.DESVIA.G.SA/AGUA-A1-OP-RP-06/04-IR | 17/12/2004 | $48,134.00 | M99-0821 | 24 | 477 | |
| 42724 | SENAL.DESVIA.G.SA/AGUA-X1-OP-RP-06/04-IR | 17/12/2004 | $142,943.27 | M99-0822 | 24 | 477 | |
| TOTAL | $1,350,178.79 | ||||||
| PROVEEDOR | 110086 CONCRETOS ASFALTICOS,S.A.DE C.V. | ||||||
| 7840 | PAV.CAM.MIRADOR-E2-OP-RP-14/04-C | 23/12/2004 | $325,346.65 | M99-0770 | 1 | 53521 | |
| TOTAL | $325,346.65 | ||||||
| PROVEEDOR | 110744 INTELLISWITCH,S.A.DE C.V. | ||||||
| 4261 | ARRENDAMIENTO DE 311 EQ. AHORR. DE ENERG | 03/12/2004 | $216,776.87 | A20-0924 | 24 | 338 | |
| 4303 | ARRENDAMIENTO DE 160 EQ. AHORR. DE ENERG | 03/12/2004 | $122,006.96 | A20-0925 | 24 | 338 | |
| 4332 | REM. Y MODER. 47 EQ. PROPIEDAD DE MPIO | 03/12/2004 | $257,278.00 | A20-0934 | 24 | 338 | |
| 4333 | RELATIVO A REM. Y MOD. 47 EQ. PROP DEL M | 03/12/2004 | $257,278.00 | A20-0935 | 24 | 338 | |
| TOTAL | $853,339.83 | ||||||
| PROVEEDOR | 111035 EL PARIAN JARDINERIA INTEGRAL,S.A | .DE C.V. | |||||
| 1784 | SERV.PROF.ASESORIA PAISAJE URBANO | 21/12/2004 | $304,750.00 | C15-0103 | 24 | 527 | |
| TOTAL | $304,750.00 | ||||||
| PROVEEDOR | 112760 ASFALTECS,S.A.DE C.V. | ||||||
| 5673 | PAV.C-V.HERM-E2-SSP-DA-CI-26/04 | 03/12/2004 | $108,605.72 | A20-0945 | 24 | 340 | |
| 5674 | PAV.C-V.HERM-E3-SSP-DA-CI-26/04 | 03/12/2004 | $96,730.95 | A20-0946 | 24 | 340 | |
| 5684 | 300 TN BASE 8 CON FLETE | 13/12/2004 | $17,697.00 | OC0-6642 | 24 | 420 | |
| 5686 | PAV.C-V.HERM-A1-SSP-DA-CI-26/04 | 03/12/2004 | $23,689.59 | A20-0947 | 24 | 340 | |
| 5687 | 500 TNCARPETA ASFALTICA | 13/12/2004 | $171,999.75 | OC0-8138 | 24 | 420 | |
| 5690 | 300 TN ASFALTO | 15/12/2004 | $17,670.90 | OC0-8116 | 24 | 423 | |
| 5693 | 300 TN BASE 8 C FLETE | 13/12/2004 | $17,670.90 | OC0-9248 | 24 | 420 | |
| 5694 | BASE NO. 8 CON FLETE | 13/12/2004 | $17,670.90 | OC0-9249 | 24 | 420 | |
| 5695 | BASE NO. 8 CON FLETE | 13/12/2004 | $17,670.90 | OC0-9246 | 24 | 420 | |
| 5711 | 3000 TN. ASFALTO | 15/12/2004 | $12,000.00 | OC0-7509 | 24 | 423 | |
| 5712 | 3000 TN. ASFALTO FR-3 SIN FLETE | 15/12/2004 | $12,000.00 | OC0-9342 | 24 | 423 | |
| 5713 | 3000 TN. ASFALTO FR-3 SIN FLETE | 15/12/2004 | $12,000.00 | OC0-9333 | 24 | 423 | |
| 5721 | CARPETA ASFALTICA | 15/12/2004 | $171,999.75 | OC0-8124 | 24 | 423 | |
| 5722 | 500 TN. CARPETA ASFALTICA | 15/12/2004 | $171,999.75 | OC0-9560 | 24 | 423 | |
| 5730 | 300 TN. BASE 8 CON FLETE | 22/12/2004 | $17,670.90 | OC0-8113 | 24 | 548 | |
| 5731 | 300 TN BASE 8 | 22/12/2004 | $17,670.90 | OC0-8117 | 24 | 548 | |
| 5735 | 500 TN. CARPETA ASFALTICA | 22/12/2004 | $171,999.75 | OC0-8139 | 24 | 548 | |
| 5740 | 3000 LT. ASFALTO FR3 | 22/12/2004 | $12,000.00 | OC0-6789 | 24 | 548 | |
| TOTAL | $1,088,747.66 | ||||||
| PROVEEDOR | 113264 COMERCIALIZADORA INTERNACIONAL DE | HORTICULT | URA,S.A | ||||
| 10533 | REFOR.G.SAD-A-SSP-DA-CI-56/04 | 22/12/2004 | $504,669.27 | A20-1012 | 24 | 537 | |
| TOTAL | $504,669.27 | ||||||
| PROVEEDOR | 113278 COMPACTACIONES Y OBRAS DE MTY.S.A | .DE C.V. | |||||
| 2896 | CISTERN.D-TODAS-A-SSP-DA-LP-14/04 | 10/12/2004 | $1,155,812.24 | A20-0962 | 24 | 389 | |
| TOTAL | $1,155,812.24 | ||||||
| PROVEEDOR | 113293 LOREDO SILVA ANA ISABEL | ||||||
| 1211 | EXPL.ORNAT-A-SSP-DA-CI-55/04 | 10/12/2004 | $240,242.67 | A20-0931 | 24 | 390 | |
| TOTAL | $240,242.67 | ||||||
| PROVEEDOR | 113609 GRUPO CONSTRUCTOR ACERO,S.A.DE C. | V. | |||||
| 1110 | PLZS.P.SOL-E3-SSP-DA-CI-16/04 | 24/12/2004 | $162,391.39 | A20-1039 | 1 | 53539 | |
| 1111 | PLZS.P.SOL-A2-SSP-DA-CI-16/04 | 24/12/2004 | $89,136.86 | A20-1038 | 1 | 53539 | |
| 1112 | PLZS.P.SOL-X1-SSP-DA-CI-16/04 | 24/12/2004 | $93,695.69 | A20-1037 | 1 | 53539 | |
| TOTAL | $345,223.94 | ||||||
| PROVEEDOR | 113626 PROYECTOS Y ELECTRIFICACIONES MV, | S.A.DE C.V | . | ||||
| 119 | FOCOS | 02/12/2004 | $26,953.00 | OC0-8408 | 24 | 318 | |
| 127 | BALASTRAS | 21/12/2004 | $65,370.00 | OC0-8458 | 24 | 523 | |
| 128 | BALASTRAS | 21/12/2004 | $65,370.00 | OC0-8476 | 24 | 523 | |
| 134 | CABLES | 02/12/2004 | $170,780.00 | OC0-8507 | 24 | 318 | |
| 136 | POLIDUCTO | 21/12/2004 | $4,944.00 | OC0-8441 | 24 | 523 | |
| 137 | POLIDUCTO | 21/12/2004 | $4,944.00 | OC0-8423 | 24 | 523 | |
| 138 | POLIDUCTO | 21/12/2004 | $4,944.00 | OC0-8442 | 24 | 523 | |
| 139 | POLIDUCTOS | 21/12/2004 | $4,944.00 | OC0-8520 | 24 | 523 | |
| 141 | BALASTRA | 21/12/2004 | $28,762.80 | OC0-8433 | 24 | 523 | |
| 142 | BALASTRAS | 21/12/2004 | $28,762.80 | OC0-8501 | 24 | 523 | |
| 143 | BALASTRA | 21/12/2004 | $26,148.00 | OC0-8435 | 24 | 523 | |
| 144 | BALASTRAS | 21/12/2004 | $31,377.60 | OC0-8524 | 24 | 523 | |
| 145 | CABLE | 21/12/2004 | $65,250.00 | OC0-8486 | 24 | 523 | |
| 146 | CABLE | 21/12/2004 | $65,250.00 | OC0-8488 | 24 | 523 | |
| 147 | CABLE | 21/12/2004 | $65,250.00 | OC0-8490 | 24 | 523 | |
| 148 | 80 BALASTRAS | 21/12/2004 | $41,836.80 | OC0-8483 | 24 | 523 | |
| 149 | 80 BALASTRAS | 21/12/2004 | $41,836.80 | OC0-8491 | 24 | 523 | |
| 150 | 80 BALASTRAS | 21/12/2004 | $41,836.80 | OC0-8448 | 24 | 523 | |
| 151 | CONTACTOR T-3 | 23/12/2004 | $10,301.34 | OC0-8399 | 24 | 554 | |
| 152 | CONTACTOR | 23/12/2004 | $10,301.34 | OC0-8473 | 24 | 554 | |
| 153 | CONTACTOR | 23/12/2004 | $34,337.80 | OC0-8479 | 24 | 554 | |
| 154 | BALASTRAS, CONTACTOR Y POLIDUCTO | 23/12/2004 | $47,436.90 | OC0-8505 | 24 | 554 | |
| 155 | BALASTRAS, CONTACTOR Y POLIDUCTO | 23/12/2004 | $47,436.90 | OC0-8405 | 24 | 554 | |
| 156 | BALASTRAS, CONTACTOR Y POLIDUCTO | 23/12/2004 | $47,436.90 | OC0-8403 | 24 | 554 | |
| 157 | BALASTRAS, CONTACTOR Y POLIDUCTO | 23/12/2004 | $47,436.90 | OC0-8517 | 24 | 554 | |
| 158 | CABLES, FOCOS Y BALASTRAS | 21/12/2004 | $57,482.80 | OC0-9743 | 24 | 523 | |
| 159 | CABLES, FOCOS Y BALASTRAS | 21/12/2004 | $72,867.00 | OC0-9739 | 24 | 523 | |
| 160 | CABLES, FOCOS Y BALASTRAS | 21/12/2004 | $72,867.00 | OC0-9742 | 24 | 523 | |
| TOTAL | $1,232,465.48 | ||||||
| PROVEEDOR | 113649 CONSTRUCCIONES Y EXCAVACIONES DEL | NTE.S.A.D | E C.V. | ||||
| 1691 | PLZS.1-2-C-V.ALTO-A3-SSP-DA-CI-31/04 | 21/12/2004 | $14,888.87 | A20-0965 | 24 | 509 | |
| 1692 | PLZS.1-2-C-V.ALTO-E4-SSP-DA-CI-31/04 | 21/12/2004 | $77,987.96 | A20-0964 | 24 | 509 | |
| 1694 | PAV.C-CTO-A-SSP-DA-LP-16/04 | 06/12/2004 | $513,338.05 | A20-0952 | 24 | 363 | |
| 1695 | PLZS.1-2-C-V.ALTO-X1-SSP-DA-CI-31/04 | 21/12/2004 | $22,040.11 | A20-0966 | 24 | 509 | |
| 1696 | REH.PZS.C-ALIANZA-E1-SSP-DA-LP-12/04 | 22/12/2004 | $146,483.37 | A20-0987 | 24 | 538 | |
| 1698 | PLZS.C-V.ALTO-E5-SSP-DA-CI-31/04 | 24/12/2004 | $8,768.06 | A20-1021 | 24 | 561 | |
| 1699 | PLZS.C-ALIANZA-E2-SSP-DA-LP-12/04 | 24/12/2004 | $396,852.02 | A20-1020 | 24 | 561 | |
| TOTAL | $1,180,358.44 | ||||||
| PROVEEDOR | 113766 GUEVARA OBREGON ROSA IMELDA | ||||||
| 58 | ESCALIN.C-G.MENDIO-E1-OP-IS-18/04-AD | 14/12/2004 | $77,520.47 | M99-0871 | 60 | 191 | |
| TOTAL | $77,520.47 | ||||||
| PROVEEDOR | 113774 DESARROLLO INMOBILIARIO HABITACIO | NAL,S.A.DE | C.V. | ||||
| 550 | AG.POT.F-106-E1-OP-IS-04/04-IR | 14/12/2004 | $297,022.05 | M99-0885 | 60 | 189 | |
| 551 | AG.POT.F-106-E2-OP-IS-04/04-IR | 21/12/2004 | $242,830.53 | M99-0918 | 60 | 215 | |
| TOTAL | $539,852.58 | ||||||
| PROVEEDOR | 113877 GARZA TREVINO ILDELFONSO GUSTAVO | ||||||
| 911 | TRAS.26 ARBOLES-E2-SSP-DA-CI-29/04 | 14/12/2004 | $184,781.82 | A20-0850 | 24 | 422 | |
| 919 | TRAS.63 ENCINOS-E1-SSP-DA-CI-29/04 | 14/12/2004 | $324,523.06 | A20-0849 | 24 | 422 | |
| 934 | REFOR.G.SA/S.AGUA-A-SSP-DA-LP-18/04 | 22/12/2004 | $567,113.93 | A20-1016 | 24 | 540 | |
| TOTAL | $1,076,418.81 | ||||||
| PROVEEDOR | 113951 CORPORACION CEREYRO,S.A.DE C.V. | ||||||
| 221 | REGISTRO DE CONCRETO | 13/12/2004 | $155,015.40 | OC0-5330 | 1 | 53156 | |
| TOTAL | $155,015.40 | ||||||
| PROVEEDOR | 114145 AYALA RIOS RUBEN | ||||||
| 77 | REM.SEC.AYU-E2-SSP-DA-CI-46/04 | 01/12/2004 | $94,230.17 | A20-0908 | 1 | 52884 | |
| 78 | REM.SEC.AYU-X1-SSP-DA-CI-46/04 | 01/12/2004 | $209,702.47 | A20-0909 | 1 | 52884 | |
| TOTAL | $303,932.64 | ||||||
| PROVEEDOR | 114186 PROVEEDORA P/LA CONSTRUCCION REGI | OMONTANA,S | .A.DE C | ||||
| 1007 | CABALL.C-REFO-E2-PR-RP-02/04-IR | 10/12/2004 | $257,297.69 | M99-0804 | 24 | 404 | |
| 1013 | CABALLER.C-REFO-E3-PR-RP-02/04-IR | 20/12/2004 | $185,526.41 | M99-0815 | 24 | 496 | |
| 1016 | ESCALIN.C-G.MENDIO-E1-OP-IS-08/04-IR | 10/12/2004 | $221,890.35 | M99-0840 | 60 | 179 | |
| TOTAL | $664,714.45 | ||||||
| PROVEEDOR | 114211 CONSTRUGRAMA, SA. DE CV. | ||||||
| 435 | EQ.BOMB.D-N,C,S,P-A-SSP-DA-CI-52/04 | 30/12/2004 | $311,386.21 | A20-0957 | 1 | 53827 | |
| TOTAL | $311,386.21 | ||||||
| PROVEEDOR | 119057 DUCTO PUENTES S.A. DE C.V. | ||||||
| 1205 | PAV.AV.S.NICO-A-SSP-DA-LP-17/04 | 22/12/2004 | $627,309.50 | A20-0951 | 24 | 544 | |
| TOTAL | $627,309.50 | ||||||
| PROVEEDOR | 119086 RAMIREZ VERASTEGUI ISIDRO RAMON | ||||||
| 1820 | MONOLI-X1-SSP-DA-CI-13/04 | 01/12/2004 | $184,969.02 | A20-0907 | 24 | 301 | |
| 1821 | 9 MONOLITOS-X2-SSP-DA-CI-13/04 | 29/12/2004 | $17,130.81 | A20-0988 | 1 | 53815 | |
| TOTAL | $202,099.83 | ||||||
| PROVEEDOR | 119175 MONTEMAYOR GONZALEZ ALEJANDRO | ||||||
| 1084 | REH.ESC.J.NUNO-E1-OP-RP-ME-01/04-AD | 21/12/2004 | $195,498.81 | M99-0828 | 24 | 511 | |
| TOTAL | $195,498.81 | ||||||
| PROVEEDOR | 119182 PAVIMENTACIONES CAMINOS Y COMPACT | ACIONES,S. | A.DE C. | ||||
| 4859 | 2000 TN. CARPETA ASFALTICA | 17/12/2004 | $766,820.00 | OC0-5424 | 24 | 487 | |
| TOTAL | $766,820.00 | ||||||
| PROVEEDOR | 119186 ROMO GARZA RODOLFO | ||||||
| 462 | AG.POT.C-S.BERNA-E1-OP-IS-06/04-C | 20/12/2004 | $198,948.21 | M99-0881 | 60 | 203 | |
| 465 | AG.POT.C-S.BERNA-A1-OP-IS-06/04-C | 20/12/2004 | $137,550.60 | M99-0880 | 60 | 203 | |
| TOTAL | $336,498.81 | ||||||
| PROVEEDOR | 119205 DINAMICA OPERATIVA,S.A.DE C.V. | ||||||
| 3108 | PTE.CANAL C-MIRASOL-E1-OP-RP-46/04-IR | 17/12/2004 | $189,460.08 | M99-0814 | 1 | 53405 | |
| TOTAL | $189,460.08 | ||||||
| PROVEEDOR | 122499 ELECTRICA CONTRY, SA. | ||||||
| 4287 | 3 POZOS C-A.SECO-X1-SSP-DA-CI-05/04-AD | 28/12/2004 | $45,503.92 | A20-0979 | 24 | 570 | |
| TOTAL | $45,503.92 | ||||||
| PROVEEDOR | 123012 CONSTRUCTORA PENA PALMA, S.A. DE | C.V. | |||||
| 9035 | PAV.C-01-JUN-A1-OP-RP-21/04-IR | 20/12/2004 | $192,702.38 | M99-0622 | 24 | 504 | |
| 9036 | PAV.C-01-JUN-X1-OP-RP-21/04-IR | 20/12/2004 | $64,020.36 | M99-0623 | 24 | 504 | |
| TOTAL | $256,722.74 | ||||||
| PROVEEDOR | 123013 SELLOS Y PAVIMENTOS, S.A. | ||||||
| 10331 | PAV.F-25-E2-OP-RP-45/04-IR | 30/12/2004 | $150,676.08 | M99-0861 | 1 | 53823 | |
| 10332 | PAV.F-25-E1-OP-RP-45/04-IR | 30/12/2004 | $37,060.59 | M99-0860 | 1 | 53823 | |
| 10350 | PAV.C-F-25-E3-OP-RP-45/04-IR | 30/12/2004 | $72,308.11 | M99-0912 | 1 | 53823 | |
| TOTAL | $260,044.78 | ||||||
| PROVEEDOR | 123028 HERCAN CONSTRUCCIONES, S.A. DE C. | V. | |||||
| 711 | PAV.C-B.JUAREZ-E1-SSP-DA-CI-41/04 | 21/12/2004 | $459,988.33 | A20-0967 | 24 | 530 | |
| TOTAL | $459,988.33 | ||||||
| PROVEEDOR | 123037 CONSTRUCCIONES CUPRE,S.A. DE C.V. | ||||||
| 6378 | PAV.D-C-A1-SSP-DA-CI-27/04 | 06/12/2004 | $107,341.41 | A20-0949 | 24 | 365 | |
| 6413 | PAV.C-MITRAS-E1-SSP-DA-CI-43/04 | 02/12/2004 | $945,277.13 | A20-0927 | 24 | 331 | |
| 6414 | PAV.C-MITRAS-A1-SSP-DA-CI-43/04 | 01/12/2004 | $83,404.18 | A20-0936 | 24 | 303 | |
| 6415 | PAV.C-MITRAS-E2-SSP-DA-CI-43/04 | 01/12/2004 | $66,161.34 | A20-0928 | 24 | 303 | |
| 6416 | PAV.C-MITRAS-A2-SSP-DA-CI-43/04 | 02/12/2004 | $61,529.41 | A20-0929 | 24 | 331 | |
| TOTAL | $1,263,713.47 | ||||||
| PROVEEDOR | 123058 CONDULINEAS,S.A. DE C.V. | ||||||
| 3755 | DR.PLUV.R.FRIAS-E1-OP-RP-22/04-C | 22/12/2004 | $618,656.81 | M99-0625 | 24 | 545 | |
| 3756 | DR.PLUV.R.FR-A1-OP-RP-22/04-C | 22/12/2004 | $38,777.31 | M99-0651 | 24 | 545 | |
| 3769 | DR.PLUV.R.FR-X1-OP-RP-22/04-C | 22/12/2004 | $139,626.76 | M99-0650 | 24 | 545 | |
| 3782 | DR.PLUV.R.FR/LEO-E2-OP-RP-22/04-C | 22/12/2004 | $633,242.53 | M99-0742 | 24 | 545 | |
| 3783 | DR.PLUV.R.FR/LEO-A2-OP-RP-22/04-C | 22/12/2004 | $75,149.13 | M99-0743 | 24 | 545 | |
| 3784 | DR.PLUV.R.FR/LEO-X2-OP-RP-22/04-C | 22/12/2004 | $35,895.15 | M99-0744 | 24 | 545 | |
| TOTAL | $1,541,347.69 | ||||||
| PROVEEDOR | 123060 CONST. MAIZ MIER,S.A. DE C.V. | ||||||
| 15569 | PAV.G.SA/L.ELI-TT-OP-RP-07/04-C | 10/12/2004 | $1,293,591.63 | M99-0807 | 24 | 410 | |
| TOTAL | $1,293,591.63 | ||||||
| PROVEEDOR | 123068 CONSTRUCTORA MONTEMAYOR CHAPA,S.A | . | |||||
| 1877 | ANDADOR C-TREVI-X1-OP-IS-07/04-IR | 20/12/2004 | $10,971.33 | M99-0879 | 60 | 204 | |
| TOTAL | $10,971.33 | ||||||
| PROVEEDOR | 123073 DESARROLLO Y CONSTRUCCIONES URBAN | AS,SA. | |||||
| 7913 | RAM.G.SA/2-ABR-TT-OP-RP-09/04-C | 10/12/2004 | $11,483,878.28 | M99-0806 | 24 | 419 | |
| TOTAL | $11,483,878.28 | ||||||
| PROVEEDOR | 123084 CAMINOS Y URB.NACIONALES,S.A. DE | C.V. | |||||
| 1838 | DR.SANI.C-PROV.S.BERNA-E3-OP-IS-01/04-C | 14/12/2004 | $34,980.34 | M99-0839 | 60 | 184 | |
| TOTAL | $34,980.34 | ||||||
| PROVEEDOR | 123108 CONSTRUCCIONES SYD, S.A. DE C.V. | ||||||
| 1152 | ESCALI.C-S.HEROI-E1-OP-IS-13/04-AD | 06/12/2004 | $81,253.79 | M99-0796 | 60 | 176 | |
| TOTAL | $81,253.79 | ||||||
| PROVEEDOR | 123147 CONSTRUCCIONES MAYVI,S.A. DE C.V. | ||||||
| 1850 | ESCALIN.C-S.VENTANA-E1-OP-IS-12/04-AD | 13/12/2004 | $77,967.79 | M99-0829 | 60 | 180 | |
| 1851 | ESCALIN.C-S.VENTANA-A1-OP-IS-12/04-AD | 13/12/2004 | $8,447.34 | M99-0830 | 60 | 180 | |
| TOTAL | $86,415.13 | ||||||
| PROVEEDOR | 123192 CONSTRUCCIONES Y REMOD.GARCIA,S.A | . DE CV | |||||
| 2067 | OF.PAS.PQ.TUC-X1-SSP-DA-CI-20/04 | 16/12/2004 | $174,983.60 | A20-0948 | 24 | 473 | |
| 2081 | OF.PASA.PQ.TUCA-E1-SSP-DA-CI-47/04 | 07/12/2004 | $388,777.86 | A20-0906 | 24 | 372 | |
| TOTAL | $563,761.46 | ||||||
| PROVEEDOR | 123194 OBRAS DE INGENIERIA LEON,S.A. DE | C.V. | |||||
| 557 | DR.SANIT.C-INDEPE-A-OP-IS-28/04-AD | 20/12/2004 | $23,387.94 | M99-0838 | 60 | 205 | |
| TOTAL | $23,387.94 | ||||||
| PROVEEDOR | 123204 ORGANIZACION Y SERV.PARA LA CONST | .SA CV | |||||
| 1003 | CAMELL.A.PERI-E1-SSP-DA-LP-06/04 | 10/12/2004 | $309,902.32 | A20-0953 | 24 | 411 | |
| 1004 | CAMELL.A.PERI-A1-SSP-DA-LP-06/04 | 10/12/2004 | $35,343.65 | A20-0954 | 24 | 411 | |
| 1005 | CAMELL.A.PERI-X1-SSP-DA-LP-06/04 | 10/12/2004 | $18,786.84 | A20-0955 | 24 | 411 | |
| 1006 | CAMELL.A.PERI-E2-SSP-DA-LP-06/04 | 10/12/2004 | $363,969.81 | A20-0956 | 24 | 411 | |
| 1009 | CAMELL.AN.PERIF-A2-SSP-DA-LP-06/04 | 10/12/2004 | $55,299.54 | A20-0961 | 24 | 411 | |
| TOTAL | $783,302.16 | ||||||
| PROVEEDOR | 123231 GUAJARDO Y ASOCS.CONSTRUCTORA, S. | A. | |||||
| 2487 | DR.PLUV.C-H.FERROCA-E1-OP-RP-18/04-C | 23/12/2004 | $449,759.71 | M99-0716 | 1 | 53523 | |
| TOTAL | $449,759.71 | ||||||
| PROVEEDOR | 123232 CONSTRUCTORA ROGACU, S.A. | ||||||
| 1626 | ESCALIN.C-G.MENDIO-A-OP-IS-24/04-IR | 20/12/2004 | $78,815.91 | M99-0808 | 60 | 209 | |
| 1637 | DR.PLUV.F-45-E1-OP-RP-50/04-IR | 21/12/2004 | $650,666.51 | M99-0855 | 24 | 531 | |
| TOTAL | $729,482.42 | ||||||
| PROVEEDOR | 123244 COMAR CONSTRUCCIONES, SA. DE CV. | ||||||
| 1126 | 9 PZS.C-SOLI-E1-SSP-DA-LP-08/04 | 16/12/2004 | $969,665.90 | A20-0831 | 24 | 474 | |
| 1128 | REM.OF.SER.PUB-E1-SSP-DA-LP-04/04 | 16/12/2004 | $486,507.37 | A20-0860 | 24 | 474 | |
| 1134 | 9 PZS. B-DEL PRADO-E2-SSP-DA-LP-08/04 | 16/12/2004 | $356,763.42 | A20-0897 | 24 | 474 | |
| 1152 | MONUM,PIPORRO-E1-SSP-DA-07/04-AD | 16/12/2004 | $181,329.53 | A20-0969 | 24 | 474 | |
| 1154 | REM.OF.SERV.PUB-E2-SSP-DA-LP-04/04 | 16/12/2004 | $938,213.69 | A20-0973 | 24 | 474 | |
| 1155 | OF.SER.PUB-A2-SSP-DA-LP-04/04 | 16/12/2004 | $46,401.72 | A20-0982 | 24 | 474 | |
| 1159 | OF.SER.PUB-X1-SSP-DA-LP-04/04 | 16/12/2004 | $607,540.75 | A20-0981 | 24 | 474 | |
| TOTAL | $3,586,422.38 | ||||||
| PROVEEDOR | 123255 ABC Y CONSTRUCCIONES, SA. DE CV. | ||||||
| 1579 | DR.PLUV.SANJEMO-E3-OP-RP-12/04-C | 21/12/2004 | $315,003.62 | M99-0883 | 24 | 512 | |
| TOTAL | $315,003.62 | ||||||
| PROVEEDOR | 123262 CONSTRUCCIONES DYNAMO, SA. | ||||||
| 1060 | MNTO.AR.VERDES-E6-SADA/22/04 | 10/12/2004 | $1,069,262.78 | A20-0959 | 24 | 412 | |
| 1061 | MNTO.AR.VERD.A1-SADA/22/04 | 10/12/2004 | $229,522.65 | A20-0960 | 24 | 412 | |
| 1075 | DR.PLUV.C-CDS.JERONI-E2-OP-RP-13/04-C | 24/12/2004 | $228,891.70 | M99-0929 | 24 | 563 | |
| TOTAL | $1,527,677.13 | ||||||
| PROVEEDOR | 123266 INFRAEST.DE VIVIENDA REGIOMONT.SA | . | |||||
| 301 | BARDA ALAMEY-A-PR-RP-05/04-IR | 23/12/2004 | $298,156.88 | M99-0681 | 1 | 53524 | |
| TOTAL | $298,156.88 | ||||||
| PROVEEDOR | 123280 LOPEZ GARZA ANA ELIZABETH | ||||||
| 705 | PAV.C-INDUST-E1-OP-IS-09/04-AD | 14/12/2004 | $73,223.51 | M99-0875 | 60 | 185 | |
| 707 | PAV.C-INDUST.E1-OP-IS-09/04-AD | 21/12/2004 | $28,579.98 | M99-0941 | 60 | 212 | |
| TOTAL | $101,803.49 | ||||||
| PROVEEDOR | 123282 CONSTRUCCIONES Y DER. MTY. SA. | ||||||
| 1695 | DR.SANIT.C-PROVILEON-E1-OP-IS-03/04-C | 13/12/2004 | $461,800.49 | M99-0836 | 60 | 181 | |
| TOTAL | $461,800.49 | ||||||
| PROVEEDOR | 123291 FLORES GARZA LUIS ING. | ||||||
| 1564 | DR.PLUV.C-H.FERR-E1-OP-RP-20/04-C | 03/12/2004 | $110,225.39 | M99-0704 | 24 | 356 | |
| 1570 | DR.PLUV.C-H.FERROCA-E2-OP-RP-20/04-C | 03/12/2004 | $291,320.26 | M99-0766 | 24 | 356 | |
| 1577 | PAV.C-CROC-A-OP-RP-58/04-IR | 21/12/2004 | $446,394.92 | M99-0811 | 24 | 513 | |
| 1578 | PAV.C-HIDALGO-A-OP-IS-23/04-IR | 14/12/2004 | $73,764.17 | M99-0813 | 60 | 187 | |
| 1582 | PAV.C-REF.URB-E3-OP-RP-32/04-IR | 21/12/2004 | $119.31 | M99-0864 | 24 | 513 | |
| TOTAL | $921,824.05 | ||||||
| PROVEEDOR | 123293 EDIFICADORA TAMATAN, SA. | ||||||
| 1004 | DR.SANIT.C-PD.AGUILA-X1-OP-IS-06/02-AD | 23/12/2004 | $38,581.84 | M99-0928 | 19 | 299 | |
| 1029 | DR.SANI.C-PD.AGILA-E3-OP-IS-06/02-AD | 14/12/2004 | $13,441.05 | M99-0819 | 60 | 190 | |
| 1030 | DR.SANI.C-PD.AGUILA-A1-OP-IS-06/02-AD | 21/12/2004 | $2,215.57 | M99-0898 | 19 | 298 | |
| TOTAL | $54,238.46 | ||||||
| PROVEEDOR | 123307 CONSTRUCTORA JOMABE, SA. | ||||||
| 1330 | MURO DREN.PQ.CAN-X1-SSP-DA-LP-09/04 | 02/12/2004 | $88,625.38 | A20-0915 | 24 | 332 | |
| 1331 | MURO DR.SANI.P.CANO-E5-SSP-DA-LP-09/04 | 02/12/2004 | $942,576.84 | A20-0937 | 24 | 332 | |
| 1332 | MURO DR.SANI.P.CANO-A2-SSP-DA-LP-09/04 | 02/12/2004 | $54,752.63 | A20-0938 | 24 | 332 | |
| 1338 | MUR.DR.SANI-E6-SSP-DA-LP-09/04 | 28/12/2004 | $493,201.21 | A20-0990 | 24 | 571 | |
| 1339 | MUR.DR.SANI-A3-SSP-DA-LP-09/04 | 28/12/2004 | $68,083.75 | A20-0991 | 24 | 571 | |
| TOTAL | $1,647,239.81 | ||||||
| PROVEEDOR | 123309 VARGAS TORRES Y ASOCIADOS, SA. | ||||||
| 697 | ESTU.EJE P.GZZ/S.BARBARA | 03/12/2004 | $198,950.00 | M99-0522 | 1 | 53020 | |
| TOTAL | $198,950.00 | ||||||
| PROVEEDOR | 123310 LANKENAU DE LA GARZA ALBERTO | ||||||
| 2838 | TOPOGRAF.GONZA/FLETEROS | 02/12/2004 | $120,750.00 | M99-0736 | 24 | 333 | |
| TOTAL | $120,750.00 | ||||||
| PROVEEDOR | 123315 GRUPO CONSTRUCTOR JANUS, SA. | ||||||
| 550 | CAMELL.C-P.RESI-E1-SSP-DA-LP-07/04 | 06/12/2004 | $321,439.90 | A20-0942 | 24 | 366 | |
| 552 | CAMELL.C-P.RESI-A1-SSP-DA-LP-07/04 | 06/12/2004 | $1,208.42 | A20-0943 | 24 | 366 | |
| 553 | PASE.FID.VQZ-E2-SSP-DA-LP-03/04 | 10/12/2004 | $795,024.07 | A20-0944 | 24 | 413 | |
| 558 | PAS.F.VQZ-A1-SSP-DA-LP-03/04 | 10/12/2004 | $160,649.32 | A20-0958 | 24 | 413 | |
| TOTAL | $1,278,321.71 | ||||||
| PROVEEDOR | 123316 CONSTRUCTORA Y URBANIZADORA JE-FE | , SA. | |||||
| 345 | DR.SANI.C-NOG.DLS-A-OP-IS-23/04-AD | 03/12/2004 | $13,807.77 | M99-0750 | 60 | 174 | |
| 346 | DR.SANI.C-NOG.DLS-A-OP-IS-24/04-AD | 03/12/2004 | $13,837.95 | M99-0748 | 60 | 174 | |
| 349 | DR.SANIT-C-NDL.SIERR-E1-OP-IS-14/04-AD | 13/12/2004 | $77,833.18 | M99-0834 | 60 | 182 | |
| 351 | DR.SANIT-C-NDL.SIERR-E2-OP-IS-14/04-AD | 13/12/2004 | $26,595.36 | M99-0835 | 60 | 182 | |
| TOTAL | $132,074.26 | ||||||
| PROVEEDOR | 123343 RAMIREZ GUEVARA FRANCISCO MARTIN | ||||||
| 413 | PAV.C-CONTRY-A-SSP-DA-CI-53/04 | 13/12/2004 | $244,703.55 | A20-0886 | 1 | 53155 | |
| TOTAL | $244,703.55 | ||||||
| PROVEEDOR | 123346 INST.ELECTROMECANICAS MTY, SA. | ||||||
| 5775 | ALUMB.CCARM.SER-A-OP-IS-22/04-IR | 14/12/2004 | $183,153.40 | M99-0798 | 60 | 186 | |
| 5776 | ALUMB.C-PRESITA-A-OP-IS-21/04-IR | 14/12/2004 | $143,209.30 | M99-0799 | 60 | 186 | |
| TOTAL | $326,362.70 | ||||||
| PROVEEDOR | 123359 ASES.EN CONT.DE CAL.CONSTR.Y SERV | .DE ING.SA | . | ||||
| 1619 | TOPOG.ARR.SECO | 27/12/2004 | $33,877.39 | M99-0628 | 1 | 53703 | |
| TOTAL | $33,877.39 | ||||||
| PROVEEDOR | 123364 BUFETE URBANISTICO, SA. | ||||||
| 283 | CAMELL.PTA.SOL-E4-SSP-DA-LP-01/04 | 02/12/2004 | $418,526.79 | A20-0939 | 24 | 334 | |
| 284 | CAMELL.PTA.SOL-A3-SSP-DA-LP-01/04 | 02/12/2004 | $349,499.84 | A20-0940 | 24 | 334 | |
| 285 | OF.TESOR-X1-SSP-DA-CI-44/04 | 02/12/2004 | $366,154.81 | A20-0941 | 24 | 334 | |
| TOTAL | $1,134,181.44 | ||||||
| PROVEEDOR | 123366 ORGANIZACION 59-64, SA. | ||||||
| 681 | ESCALIN.C-LDLU.MODELO-E2-OP-IS-03/04-AD | 20/12/2004 | $15,976.43 | M99-0872 | 60 | 206 | |
| TOTAL | $15,976.43 | ||||||
| PROVEEDOR | 123390 CHAPA KRUEGER AUGUSTO CESAR | ||||||
| 2101 | PAV.C-INDUST-A-OP-IS-30/04-AD | 03/12/2004 | $54,112.34 | M99-0800 | 60 | 175 | |
| 2102 | PAV.C-INDUST-A-OP-IS-29/04-AD | 03/12/2004 | $19,170.46 | M99-0801 | 60 | 175 | |
| 2110 | PAV.C-INDUST.-E1-OP-IS-30/04-AD | 21/12/2004 | $8,841.15 | M99-0919 | 60 | 216 | |
| 2114 | PAV.C-INDUST.-E1-OP-IS-29/04-AD | 21/12/2004 | $18,125.72 | M99-0924 | 60 | 216 | |
| TOTAL | $100,249.67 | ||||||
| PROVEEDOR | 123392 AXIS CONSTRUCCIONES DE MTY, SA. | ||||||
| 562 | MORELOS-E1-OP-RP-15/04-C | 03/12/2004 | $82,577.30 | M99-0690 | 24 | 357 | |
| 563 | MORELOS-E2-OP-RP-15/04-C | 03/12/2004 | $108,496.92 | M99-0691 | 24 | 357 | |
| 573 | PAV.C-REFO-A-OP-RP-54/04-IR | 21/12/2004 | $299,589.45 | M99-0780 | 24 | 515 | |
| TOTAL | $490,663.67 | ||||||
| PROVEEDOR | 123394 MG UNIDAD TECNICA, SA. | ||||||
| 667 | PAV.ANT.CAM.SANTI-A-OP-RP-49/04-IR | 03/12/2004 | $86,732.52 | M99-0759 | 24 | 358 | |
| 669 | LO.PTE.G-SA/SEN-TT-OP-RP-10/04-C | 10/12/2004 | $7,895,020.15 | M99-0778 | 24 | 414 | |
| 670 | REMP.G.SA/SEND-TT-OP-RP-10/04-C | 10/12/2004 | $5,149,602.39 | M99-0809 | 24 | 414 | |
| 673 | PAV.CAM.CALERAS-E1-OP-RP-49/04-IR | 28/12/2004 | $193,213.25 | M99-0857 | 24 | 572 | |
| TOTAL | $13,324,568.31 | ||||||
| PROVEEDOR | 123396 CONSTRUCTORA DIALGO, SA. | ||||||
| 1208 | PAV.C-T.CHICO-A1-OP-RP-22/04-IR | 27/12/2004 | $120,160.90 | M99-0738 | 24 | 567 | |
| 1209 | PAV.C-T.CHICO-X1-OP-RP-22/04-IR | 27/12/2004 | $136,411.79 | M99-0737 | 24 | 567 | |
| TOTAL | $256,572.69 | ||||||
| PROVEEDOR | 123398 RODADA CONSTRUCCIONES, SA. | ||||||
| 449 | PAV.C-REMATES-A1-OP-RP-11/04-IR | 16/12/2004 | $80,998.20 | M99-0640 | 24 | 475 | |
| 484 | ALBAN.D-C-E1-SSP-DA-CI-08/07 | 23/12/2004 | $51,734.44 | A20-1035 | 24 | 557 | |
| TOTAL | $132,732.64 | ||||||
| PROVEEDOR | 123400 CONST.URB.Y PROY.RDZ.SANDOVAL, SA | . | |||||
| 464 | ALBANI.PQ.D-S-E3-SSP-DA-CI-03/04 | 07/12/2004 | $20,495.92 | A20-0926 | 24 | 373 | |
| 467 | PAC.C-REMAT-E1-OP-RP-28/04-IR | 10/12/2004 | $47,721.59 | M99-0794 | 24 | 415 | |
| 469 | PAV.C-REMATES-E2-OP-RP-28/04-IR | 10/12/2004 | $206,307.88 | M99-0795 | 24 | 415 | |
| 477 | OF.SEDUE-A1-SSP-DA-LP-11/04 | 23/12/2004 | $77,913.79 | A20-1034 | 24 | 558 | |
| TOTAL | $352,439.18 | ||||||
| PROVEEDOR | 123402 DE LEON RODRIGUEZ JOSE JONAS | ||||||
| 1691 | PAV.C-BUROCR-A3-OP-FM-10/02-IR | 21/12/2004 | $25,854.82 | M99-0891 | 24 | 516 | |
| 1692 | PAV.C-BUROCR-E4-OP-FM-10/02-IR | 21/12/2004 | $4,289.60 | M99-0889 | 24 | 516 | |
| 1694 | PAV.C-B.MPALES-X1-OP-FM-10/02-IR | 21/12/2004 | $40,750.06 | M99-0892 | 24 | 516 | |
| 1695 | PAV.C-B.MPALES-A4-OP-FM-10/02-IR | 21/12/2004 | $34,115.30 | M99-0886 | 24 | 516 | |
| 1696 | PAV.C-PD.AGUIL-E3-OP-RP-38/04-IR | 21/12/2004 | $92,797.76 | M99-0888 | 24 | 516 | |
| TOTAL | $197,807.54 | ||||||
| PROVEEDOR | 123403 CAVAZOS REMODELACIONES, SA. | ||||||
| 268 | PAV.C-REMAT-A-OP-RP-56/04-IR | 23/12/2004 | $496,203.70 | M99-0842 | 1 | 53528 | |
| TOTAL | $496,203.70 | ||||||
| PROVEEDOR | 123405 INGENIERIA INTEGRAL DELMO, SA. | ||||||
| 144 | REH.ESC.C-LD.MIRADOR-A-OP-RP-ME-09/04-AD | 10/12/2004 | $53,402.87 | M99-0779 | 24 | 416 | |
| 146 | ESC.I.ARAMBU-A-OP-RP-ME-10/04-AD | 10/12/2004 | $47,232.26 | M99-0810 | 24 | 416 | |
| 147 | PROY.LIV/LEON-E1-OP-RP-12/04-AD | 10/12/2004 | $57,652.57 | M99-0788 | 24 | 416 | |
| TOTAL | $158,287.70 | ||||||
| PROVEEDOR | 123407 CONSTRUCTORA URDIALES, SA. | ||||||
| 1407 | AG.POT.C-B.MPALES-E3-OP-IS-62/01-IR | 14/12/2004 | $28,798.50 | M99-0664 | 1 | 53211 | |
| TOTAL | $28,798.50 | ||||||
| PROVEEDOR | 123413 EDIFICACIONES CIEN, SA. | ||||||
| 834 | PAV.C.REMATES-E1-OP-RP-37/04-IR | 21/12/2004 | $31,522.30 | M99-0669 | 24 | 517 | |
| 838 | PAV.C.REMATES-A2-OP-RP-37/04-IR | 21/12/2004 | $17,304.75 | M99-0672 | 24 | 517 | |
| TOTAL | $48,827.05 | ||||||
| PROVEEDOR | 123415 CRISTO INGENIEROS Y ASOCIADOS, SA | . | |||||
| 135 | PROY.PTE.G.SA/SEND-ET-OP-RP-09/04-AD | 10/12/2004 | $195,518.54 | M99-0555 | 24 | 417 | |
| 137 | PROY.PTE.G.SA/ELIZ-PU-OP-RP-07/04-AD-BIS | 10/12/2004 | $195,518.54 | M99-0590 | 24 | 417 | |
| TOTAL | $391,037.08 | ||||||
| PROVEEDOR | 123423 CEPEDA CARDONA ALBERTO MANUEL | ||||||
| 739 | TOPOGRAF.LEONES/R.FRI | 07/12/2004 | $33,681.20 | M99-0724 | 24 | 374 | |
| 740 | TOPOGRAF.BLVD.ACAPULCO | 07/12/2004 | $87,571.12 | M99-0725 | 24 | 374 | |
| 741 | TOPOGRAF.L.CARD/P.REFO. | 07/12/2004 | $50,521.80 | M99-0726 | 24 | 374 | |
| TOTAL | $171,774.12 | ||||||
| PROVEEDOR | 123424 PLANEACION INMOBILIARIA VIBE, SA. | ||||||
| 410 | PAV.C-ILUSION-E2-OP-RP-47/04-IR | 14/12/2004 | $548,794.14 | M99-0781 | 24 | 421 | |
| 411 | PAV.C-ILUSION-A1-OP-RP-47/04-IR | 30/12/2004 | $81,402.99 | M99-0906 | 24 | 577 | |
| TOTAL | $630,197.13 | ||||||
| PROVEEDOR | 123426 GONVEL, SA. | ||||||
| 851 | ANDAD.JI.RAM-X1-SSP-DA-CI-18/04 | 16/12/2004 | $18,703.68 | A20-0950 | 24 | 470 | |
| 861 | ESCALINAT.C-LDLU.MODE-A-OP-IS-06/04-AD | 08/12/2004 | $35,296.08 | M99-0797 | 60 | 177 | |
| 866 | PAV.C-MITRAS-A-SSP-DA-CI-54/04 | 02/12/2004 | $56,198.50 | A20-0933 | 24 | 335 | |
| 876 | ESCALIN.C-LDLU.MOD-E1-OP-IS-06/04-AD | 13/12/2004 | $72,488.67 | M99-0837 | 60 | 183 | |
| 877 | ESCALIN.C-LDLU.MODE-X1-OP-IS-06/04-AD | 23/12/2004 | $1,311.67 | M99-0940 | 60 | 217 | |
| TOTAL | $183,998.60 | ||||||
| PROVEEDOR | 123429 DISENO MATERIALES Y CONSTRUCCIONE | S, SA. | |||||
| 3599 | ENL.CIUDA.PQ.TU-A-OP-RP-59/04-IR | 23/12/2004 | $479,504.72 | M99-0853 | 1 | 53529 | |
| TOTAL | $479,504.72 | ||||||
| PROVEEDOR | 123430 MORALES HERNANDEZ FRANCISCO | ||||||
| 2384 | TOPOG.DR.PLIV.C-M.CUMBRES | 01/12/2004 | $17,250.00 | M99-0634 | 24 | 304 | |
| 2385 | PROYDR.PLIV.AV.F.VQZ | 01/12/2004 | $13,800.00 | M99-0635 | 24 | 304 | |
| TOTAL | $31,050.00 | ||||||
| PROVEEDOR | 123431 MONUMENTOS PUBLICITARIOS, S.R.L. | DE C.V. | |||||
| 76 | REU.PTE.PEA.MADERO-E1-OP-RP-08/04-AD | 16/12/2004 | $347,410.88 | M99-0833 | 24 | 471 | |
| TOTAL | $347,410.88 | ||||||
| PROVEEDOR | 123432 JIMENEZ RIVERA BENIGNO | ||||||
| 112 | LAVANTAMI.H.FERROCARR. | 01/12/2004 | $27,922.00 | M99-0728 | 24 | 305 | |
| 117 | TOPOGRA.ANTIG.ARR.T.CHICO | 01/12/2004 | $83,720.00 | M99-0731 | 24 | 305 | |
| TOTAL | $111,642.00 | ||||||
| PROVEEDOR | 123437 RONQUILLO LOPEZ DAVID | ||||||
| 318 | PZA.EL ROBLE-E2-SSP-DA-CI-32/04 | 27/12/2004 | $171,854.47 | A20-0998 | 24 | 568 | |
| 319 | PZA.EL ROBLE-A1-SSP-DA-CI-32/04 | 27/12/2004 | $44,204.07 | A20-0999 | 24 | 568 | |
| TOTAL | $216,058.54 | ||||||
| PROVEEDOR | 123440 CANTU GARZA ALBERTO | ||||||
| 206 | PZS.C-S.MARTIN-E2-SSP-DA-CI-37/04 | 24/12/2004 | $230,510.38 | A20-1022 | 24 | 564 | |
| 207 | PZS.C-S.MARTIN-A1-SSP-DA-CI-37/04 | 24/12/2004 | $99,501.85 | A20-1023 | 24 | 564 | |
| TOTAL | $330,012.23 | ||||||
| PROVEEDOR | 123441 CASTILLO SANTIBANEZ LUIS GERARDO | ||||||
| 127 | TOPOGRAF.LINCOLN/PELICANO | 01/12/2004 | $66,125.00 | M99-0732 | 24 | 306 | |
| TOTAL | $66,125.00 | ||||||
| PROVEEDOR | 123442 INCOTEC DEL NORTE, SA. | ||||||
| 512 | PAV.C-A.REY-A1-OP-IS-13/04-IR | 21/12/2004 | $40,897.00 | M99-0922 | 60 | 213 | |
| 513 | PAV.C-A.REYES-E2-OP-IS-13/04-IR | 21/12/2004 | $16,372.51 | M99-0921 | 60 | 213 | |
| 514 | PAV.C-A.REY-A2-OP-IS-13/04-IR | 21/12/2004 | $1,902.75 | M99-0923 | 60 | 213 | |
| 515 | PAV.C-A.REYES-E1-OP-IS-13/04-IR | 21/12/2004 | $99,751.10 | M99-0920 | 60 | 213 | |
| TOTAL | $158,923.36 | ||||||
| PROVEEDOR | 123444 CIA.MEX.DE DEMOLICIONES Y VOLADUR | AS, SA. | |||||
| 2512 | COLADO G.SA/2-ABR-E6-OP-RP-08/04-C | 01/12/2004 | $808,407.63 | M99-0768 | 24 | 307 | |
| 2513 | COLAD.G.SA/2-ABR-X1-OP-RP-08/04-C | 03/12/2004 | $939,366.40 | M99-0793 | 24 | 359 | |
| 2516 | PTE.G.SA/2-ABR-E7-OP-RP-08/04-C | 22/12/2004 | $434,242.58 | M99-0863 | 24 | 552 | |
| 2517 | PTE.G.SA/2-ABR-A4-OP-RP-08/04-C | 22/12/2004 | $168,792.42 | M99-0884 | 24 | 552 | |
| TOTAL | $2,350,809.03 | ||||||
| PROVEEDOR | 123445 DE LEON Y LEAL CONSTRUCCIONES, SA | . | |||||
| 62 | REH.ESC.J.MARTI-A-OP-RP-ME-14/04-AD | 21/12/2004 | $59,342.48 | M99-0787 | 24 | 518 | |
| 65 | REH.ESC.E.G.SADA-E1-OP-RP-ME-15/04-AD | 21/12/2004 | $14,694.40 | M99-0825 | 24 | 518 | |
| TOTAL | $74,036.88 | ||||||
| PROVEEDOR | 123446 SAGO CONSTRUCC.Y URBANIZACIONES, | SA. | |||||
| 12 | ESCALINAT.C-G.MENDIO-E1-OP-IS-12/04-IR | 08/12/2004 | $276,581.85 | M99-0831 | 60 | 178 | |
| 15 | ESCALIN.C-G.MENDIO-A-OP-IS-32/04-AD | 20/12/2004 | $53,380.29 | M99-0844 | 60 | 210 | |
| TOTAL | $329,962.14 | ||||||
| PROVEEDOR | 123447 JAIMES QUINTANILLA RICARDO | ||||||
| 707 | PAV.C-INDUST-E1-OP-IS-07/04-AD | 14/12/2004 | $58,957.08 | M99-0682 | 60 | 188 | |
| 735 | DR.PLUV.C-H.FERROCA-E2-OP-RP-19/04-C | 02/12/2004 | $508,288.29 | M99-0769 | 24 | 336 | |
| 736 | ANDADOR C-INDUST-A1-OP-IS-07/04-AD | 14/12/2004 | $14,818.51 | M99-0802 | 60 | 188 | |
| TOTAL | $582,063.88 | ||||||
| PROVEEDOR | 123453 RAMOS IMPER-AISLANTES, SA | ||||||
| 198 | PAV.C-INDUST-A1-OP-IS-05/04-AD | 20/12/2004 | $9,112.93 | M99-0877 | 60 | 207 | |
| 199 | PAV.C-INDUST-X1-OP-IS-05/04-AD | 20/12/2004 | $32,846.80 | M99-0878 | 60 | 207 | |
| TOTAL | $41,959.73 | ||||||
| PROVEEDOR | 123454 GARZA ADAME RAFAEL WENCESLAO | ||||||
| 111 | PAV.C-7-NOV-A-OP-IS-22/04-AD | 20/12/2004 | $24,281.18 | M99-0882 | 60 | 208 | |
| TOTAL | $24,281.18 | ||||||
| PROVEEDOR | 123456 OBRAS Y SERVICIOS DEL NORTE, SA. | ||||||
| 1524 | ESCALIN.C-S.VENTA-E1-OP-IS-16/04-AD | 21/12/2004 | $67,791.35 | M99-0916 | 60 | 214 | |
| 1525 | ESCALIN.C-S.VENT-A1-OP-IS-16/04-AD | 21/12/2004 | $40,131.81 | M99-0917 | 60 | 214 | |
| TOTAL | $107,923.16 | ||||||
| PROVEEDOR | 123457 KONEDI, SA. DE CV. | ||||||
| 523 | ESCALIN.C-G.MENDIOL-E1-OP-IS-19/04-AD | 20/12/2004 | $75,036.89 | M99-0873 | 60 | 211 | |
| 524 | ESCALIN.C-G.MENDIOL-A1-OP-IS-19/04-AD | 20/12/2004 | $9,928.85 | M99-0874 | 60 | 211 | |
| TOTAL | $84,965.74 | ||||||
| PROVEEDOR | 123458 CONSTRUCCIONES PERMELL, SA. | ||||||
| 1481 | REH.ESC.J.SARABIA-E1-OP-RP-ME-04/04-AD | 21/12/2004 | $87,665.13 | M99-0826 | 24 | 520 | |
| 1482 | REH.ESC.BARR.MODERNO-E1-OP-RP-ME-03/04-A | 21/12/2004 | $76,046.26 | M99-0827 | 24 | 520 | |
| 1488 | REH.ESC.A.M.DOMIN-A-OP-RP-ME-17/04-AD | 21/12/2004 | $56,752.14 | M99-0845 | 24 | 520 | |
| 1489 | ESC.M.OCAMPO-E1-OP-RP-ME-05/04-AD | 28/12/2004 | $103,285.36 | M99-0914 | 24 | 573 | |
| TOTAL | $323,748.89 | ||||||
| PROVEEDOR | 123459 VILLARREAL MENDOZA, TRISTAN, RDZ. | Y ASOC.SC. | |||||
| 375 | ANAL.ESQUE.LICITA.PROY.VIA-2005 | 17/12/2004 | $69,000.00 | M99-0723 | 1 | 53410 | |
| TOTAL | $69,000.00 | ||||||
| PROVEEDOR | 123460 COMER.ACEROS Y CONSTRUCC.EL TERRE | RO, SA. | |||||
| 31058 | PZOS.PROF.DELEG-A-SSP-DA-LP-15/04 | 16/12/2004 | $553,925.08 | A20-0932 | 24 | 472 | |
| TOTAL | $553,925.08 | ||||||
| PROVEEDOR | 123463 INFRAESTRUC.Y CONSTRUCCIONES GARC | IA, SA. | |||||
| 21 | PLAT.ACCESO M.PR/ZAR-A-OP-RP-53/04-IR | 21/12/2004 | $100,586.87 | M99-0749 | 24 | 521 | |
| TOTAL | $100,586.87 | ||||||
| PROVEEDOR | 123465 NORTEC INDUSTRIAL, SA. | ||||||
| 1555 | PAV.C-REMATE-A-OP-RP-55/04-IR | 23/12/2004 | $438,301.07 | M99-0841 | 1 | 53530 | |
| TOTAL | $438,301.07 | ||||||
| PROVEEDOR | 123466 ORGANIZACION GEMAR, SA. | ||||||
| 326 | PAV.C-CROC-A-OP-RP-57/04-IR | 23/12/2004 | $363,002.39 | M99-0843 | 1 | 53525 | |
| TOTAL | $363,002.39 | ||||||
| PROVEEDOR | 125384 FOMENTO EXPRESS HABITAT, S.A. DE | C.V. | |||||
| 270 | ANTICIPO 30% CONST. 18 VIVIENDAS | 17/12/2004 | $328,152.75 | M99-0896 | 1 | 53422 | |
| TOTAL | $328,152.75 | ||||||
| PROVEEDOR | 210000 COMISION FEDERAL DE ELECTRICIDAD | ||||||
| 11156527 | COMP.CH-51902 REUB.POSTES GZA.S. SALTO D | 16/12/2004 | $45,307.04 | 11156527 | 50 | 0 | 1 |
| 11159195 | COMP.CH-52631 REUB.POSTES GZA.SADA Y SEN | 02/12/2004 | $17,739.61 | 11159195 | 50 | 0 | 1 |
| 11159197 | COMP.CH-52630 REUB.LINEAS ELEC.GZA.S.Y 2 | 02/12/2004 | $21,825.49 | 11159197 | 50 | 0 | 1 |
| TOTAL | $84,872.14 | ||||||
| TOTAL GENERAL | $70,357,606.71 | ||||||